Conclusions

  1. 1.

    The construction and technical decisions made when designing the dam provided its normal operation without any substantial difficulties.

  2. 2.

    According to the data of on-site observations, the quality of construction works on the dam (concreting, grouting, etc.) is good on the whole.

  3. 3.

    The state of the dam and its foundation under the total design loads is normal and on the whole corresponds to the design prediction. No anomalous phenomena were noted in the behavior of the dam. The state of the dam at present is safe.

  4. 4.

    The functioning system monitoring the safety of the dam provides sufficient information for a valid assessment of its actual behavior and state.

  5. 5.

    The use of an inclined turbine intake should be considered a successful design, but when duplicating this design it is necessary to take into account the considerations expressed concerning an increase of the reliability of its operation.

  6. 6.

    Sealing off the deep sanitary outlets of high-head structures must be done immediately after the reservoir level rises to the intake sills of the units or surplusing works of high levels.

  7. 7.

    When designing high arch dams special attention should be devoted to the development of vertical transportation systems, discharge of seepage waters, and provision of reliable natural ventilation of lower galleries and bank galleries.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. N. V. Mitrushkin and E. P. Shnyrov, “The Chirkey hydroelectric station — a 1974 target construction project,” Gidrotekh. Stroit., No. 9 (1974).

  2. S. V. Veselova and A. V. Rumyantseva, “Characteristics of the engineering-geologic conditions of the Chirkey hydrostation,” Gidrotekh. Stroit., No. 2 (1975).

  3. M. A. Mironov, D. N. Shandalov, A. A. Neikovskii, and D. A. Strakhov, “Support of the left-bank slope of the foundation pit at the Chirkey hydrostation,” Tr. Gidroproekta, No. 34 (1973).

  4. N. I. Chalyi, “Organization and some results of monitoring the state of the arch dam of the Chirkey hydrostation during the first stage of filling the reservoir,” Ekspress Inf.: Ser. Stroit. Gidroelektrostantsii (Informenergo), No. 2 (326) (1976).

  5. V. V. Kotul'skii et al., “Sealing the Chirkey dam,” Gidrotekh. Stroit., No. 9, 1974.

  6. L. I. Malyshev, V. M. Kuz'min, K. I. Maksimov, and V. G. Skokov, “Results of on-site observations of seepage in the foundation of the Chirkey arch dam during filling of the reservoir,” Tr. Gidroproekta, No. 58 (1977).

  7. N. I. Chalyi, “Behavior of the Chirkey arch dam during initial filling of the reservoir,” Izv. VNIIG,125 (1978).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 12, pp. 5–10, December, 1981.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zelenevskii, Z.L., Chalyi, N.I. First results of the operation of the arch dam of the Chirkey hydroelectric station. Hydrotechnical Construction 15, 715–724 (1981). https://doi.org/10.1007/BF01432793

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01432793

Keywords

Navigation