Optimization of the distribution of the load among units of the Chirkey hydroelectric station

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    Optimization of the distribution of the load among units makes it possible to substantially increase the economic efficiency of operation of the Chirkey hydrostation, especially with the limitations on the number and composition of operating units existing at the hydrostation.

  2. 2.

    Realization of the optimal distribution of the load at operating hydrostations with analog group regulation systems is possible after installing at the hydrostations a computer with an input of corrective actions from it to the turbine regulators.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. Z. L. Zelenevskii and A. A. Kuprik, “Modification of the turbine runner blades at the Chirkey hydroelectric station,” Gidrotekh. Stroit., No. 1 (1987).

  2. N. K. Malinin, Theoretical Principles of Hydropower Engineering [in Russian], Énergoatomizdat, Moscow (1985).

    Google Scholar 

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 37–40, July, 1988.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kiselev, G.S., Kuprik, A.A. Optimization of the distribution of the load among units of the Chirkey hydroelectric station. Hydrotechnical Construction 22, 420–426 (1988). https://doi.org/10.1007/BF01432353

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01432353

Keywords

Navigation