Progressive layouts, designs, and technologies in constructing the main structures of the underground complex of the Khudoni hydroelectric station

  • Research and Hydropower Construction
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. G. T. Mikeladze et al., “Improved layouts, designs, and technologies in constructing the underground complex of the Khudoni hydroelectric station,” Informénergo. Ser. Sooruzh. Gidroelektrostantsii, No. 12 (1987).

  2. Yu. P. Khechinov and R. V. Partsvaniya, “Dispersed reinforced shotcrete for underground structures of the Khudoni hydroelectric station,” Informénergo. Ser. Sooruzh. Gidroelektrostantsii, No. 3 (1987).

  3. A. D. Chitanava, “The Khudoni hydro development on the Inguri River,” Energ. Stroit., No. 6 (1987).

  4. Yu. E. Khechinov, Increase of the Efficiency and Intensification of the Construction of Underground Structures of Diversion Hydroelectric Stations, Doctoral Dissertation Abstract, Tbilisi (1987).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 10–13, September, 1989.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mikeladze, G.T., Khechinov, Y.E. & Chaava, M.N. Progressive layouts, designs, and technologies in constructing the main structures of the underground complex of the Khudoni hydroelectric station. Hydrotechnical Construction 23, 499–504 (1989). https://doi.org/10.1007/BF01432057

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01432057

Keywords

Navigation