Investigation and experience of using concrete-pump transport at the construction of the Shul'binsk Hydroelectric Station

  • Organization and Technology of Construction
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    To reduce the cost and construction time of hydro developments, it is necessary to introduce more widely continuous concreting technologies. Concreting of heavily reinforced and thin-walled structures and members is most effectively done with cast concrete mixes by means of modern concrete pumps.

  2. 2.

    As a result of experimental investigations of pipeline delivery of mixes by BN-80-20 concrete pumps, the values of the specific resistances during pumping of various compositions of the mixes and the local resistances of quick-disconnecting pipe connections were determined; recommendations were developed for calculating the distance of pipeline transport of the mixes by the concrete pumps; the values of Kf, the volume filling of the transport cylinders of the concrete pump with the plasticized concrete mix, and Kd, the inertial component of the pressure during displacement of the mix, were refined.

  3. 3.

    The two-year experience of using the means (conveyors, concrete pumps) of craneless technology of placing concrete for construction of the powerhouse of the Shul'binsk hydro development showed that even with the high price and underutilization of the potential possibilities of the equipment and mechanisms, a considerable savings was obtained due to shortening of the construction time and start-up of the first unit of the hydrostation ahead of schedule.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. V. I. Teleshev, V. M. Danilov, and M. V. Komarinskii, “Prospects of using concrete-pump transport in hydrotechnical construction,” Gidrotekh. Stroit., No. 6 (1986).

  2. Yu. B. Chirkov, “Mechanization of the construction of situ-cast piles,” Mekh. Stroit., No. 12 (1985).

  3. M. V. Komarinskii, Design and Technological Characteristics of the Construction of Concrete-Encased Steel Conduits of Pumped-Storage Stations (and Hydroelectric Stations Under Harsh Climatic Conditions) with the Use of Concrete Pumps [in Russian], Deposited at VNIIS, June 28, 1988, No. 9202.

  4. V. I. Teleshev, V. N. Danilov, M. V. Komarisnkii, and Yu. P. Bondarevskii, Author's Certificate No. 1395745, “Method of constructing a concrete dam,” Otkr. Izobret., No. 18 (1988).

  5. Guide to the Placement of Concrete Mixes by Concrete Pumps [in Russian], Stroiizdat, Moscow (1978).

  6. M. V. Komarinskii, Construction of Reinforced-Concrete Hydraulic Structures with the Use of Concrete-Pump Technology, Candidate Dissertation Abstract, Leningrad (1989).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 38–43, October, 1990.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Teleshev, V.I., Komarinskii, M.V., Danilov, V.M. et al. Investigation and experience of using concrete-pump transport at the construction of the Shul'binsk Hydroelectric Station. Hydrotechnical Construction 24, 639–646 (1990). https://doi.org/10.1007/BF01429341

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01429341

Keywords

Navigation