Conclusions
-
1.
The continuous concrete plant constructed at the Sayano-Shushenskoe hydrostation has higher technicoeconomic indices and is more productive and reliable compared to cyclic plants.
-
2.
Under conditions of large-scale construction of hydraulic structures the best technicoeconomic indices of concrete facilities can be provided by combining cyclic and continuous concrete plants with an optimal relationship of their capacities.
Similar content being viewed by others
Literature cited
N. A. Zinchenko and G. G. Ediger, “Operation of the proportioners of the concrete plant at the Krasnoyarsk hydroelectric station,” Stroit. Dorozh. Mash., No. 8 (1972).
A. E. Bochkin et al., Concreting Works at the Construction Site of the Krasnoyarsk Hydroelectric Station [in Russian], Stroiizdat, Moscow (1977).
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 14–17, April, 1981.
Rights and permissions
About this article
Cite this article
Zinchenko, N.A., Ryzhkov, V.A. & Gorbunov, Y.M. Adjustment and operation of the continuous concrete plant at the construction site of the Sayano-Shushenskoe hydroelectric station. Hydrotechnical Construction 15, 217–222 (1981). https://doi.org/10.1007/BF01429062
Issue Date:
DOI: https://doi.org/10.1007/BF01429062