  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    When designing pumping stations, it is necessary to specify in the design pressure leads for head flowmeters on elbows of pressure pipes and segment orifice plates in the case when there are no elbows.

  2. 2.

    It is necessary beforehand to provide for and assemble devices facilitating the measurement of discharges when testing pumps and calibrating flowmeters.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 48–49, May, 1982.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhukov, Y.K., Sarzhinskii, I.S. Improvement of water accounting at pumping stations. Hydrotechnical Construction 16, 289–291 (1982). https://doi.org/10.1007/BF01427813

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01427813

Keywords

Navigation