Conclusions
-
1.
The work of the film membrane can be considered sufficiently effective.
-
2.
Increased seepage through the grout curtain in the rock walls (especially on the right one) is leading to discharge of seepage waters on the downstream shoulder of the dam. In this connection it is recommended to install drainage in the downstream slope of the dam with discharge of the water below the depth of freezing. Further on-site observations of the discharge of seepage waters and presence of piping particles in them are necessary for determining the need for reinforcing the grout curtain in the canyon walls.
Similar content being viewed by others
Literature cited
N. I. Zinevich, I. N. Sakharov, and A. F. Nikitenkov, “The Atbashi hydroelectric station,” Gidrotekh. Stroit., No. 3 (1970).
N. I. Zinevich, V. P. Lysenko, and A. F. Nikitenkov, “The central film membrane of the Atbashi hydroelectric station,” Energ. Stroit., No. 3 (1974).
N. I. Zinevich and V. Ya. Chichasov, “Monitoring equipment of the film membrane of the earth dam of the Atbashi hydroelectric station,” Gidrotekh. Stroit., No. 3 (1972).
A. S. Vorob'ev, Hydraulic Removal of Sediments of the Reservoir of the Chir-yurt Hydroelectric Station in 1977 [in Russian], Soyuztekhenergo, Moscow (1978).
F. Sh. Mukhamedzhanov, “Calculation of flushing of pools and settling basins,” Gidrotekh. Melior., No. 2 (1966).
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 6–10, April, 1982.
Rights and permissions
About this article
Cite this article
Sakharov, I.N., Zhirkevich, A.N., Chichasov, V.Y. et al. On-site observations at the Atbashi hydroelectric station. Hydrotechnical Construction 16, 189–195 (1982). https://doi.org/10.1007/BF01427165