Conclusions

  1. 1.

    The investigations showed that passage of waste discharges through the waterway of the turbine-generator unit block with the turbine runner or blades disassembled is an acceptable scheme of passage in the operating period of a hydrostation when repairing the unit. In this case the maximum discharge capacity of the turbine block fora omax, Hd is Q=l.62Qmax (for the disassembled turbine runner) and Q=l.65Qmax (for the disassembled runner blades).

  2. 2.

    The maximum discharge capacity in the case of an assembled blade system of the unit is obtained also fora omax, ϕ=+22.5°. However, passage of the waste discharge while preserving the rotational speed of the unit close to the nominal is possible only for small heads H=0.35−0.54. When nt=nn, ϕ=+22.5°,a omax, the head at which discharge of water through the unit is possible is 0.45Hd.

  3. 3.

    The presence in the waterway of an additional resistance in the form of gates in the outlet diffuser of the draft tube makes it possible to pass waste discharges Q=(l−1.2) Qmax is a wide range of heads acting on the hydrostation H=(0.35−1.3)Hd while preserving the rotational speed of the unit close to the nominal nt=(0.9–l.l) nn.

  4. 4.

    An additional check of the indicated variants with an investigation of the strength of individual elements and components of the turbine block for particular conditions of the hydropower plant is necessary for a final recommendation of the scheme of passing waste discharges through the powerhouse part of a hydrodevelopment.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. Regulations on the Technical Operation of Electric Power Stations and Networks [in Russian], Énergiya, Moscow (1977).

  2. A. V. Gagen, “Waste release of water through the waterway of a bulb unit,” Tr. LPI, No. 289 (1968).

  3. S. I. Gorbachev and M. F. Sarkisov, “Passage of water through the waterway of turbines in the absence of a runner,” Gidrotekh. Stroit., No. 10 (1970).

  4. Yu. S. Vasil'ev, ldLaboratory power investigations of the turbine block of the Cherepovets hydroelectric station,” Tr. LPI, No. 288 (1967).

  5. Yu. S. Vasil'ev, A. Kh. Minigulov, and I. S. Samorukov, “Passage of waste discharges through the turbine-generator unit block of a low-head hydroelectric station,” Izv. Vyssh. Uchebn. Zaved., Énerg., No. 9 (1982).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 12, pp. 8–10, December, 1986.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Vasil'ev, Y.S., Minigulov, A.K. & Samorukov, I.S. Passage of waste discharges through blocks with vertical units. Hydrotechnical Construction 20, 678–680 (1986). https://doi.org/10.1007/BF01425063

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01425063

Keywords

Navigation