Skip to main content
Log in

Reconstruction of a dam water intake under conditions of continuous operation of the reservoir

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 20–23, October, 1984.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Golik, S.S. Reconstruction of a dam water intake under conditions of continuous operation of the reservoir. Hydrotechnical Construction 18, 484–489 (1984). https://doi.org/10.1007/BF01424594

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01424594

Keywords

Navigation