Ice conditions in pools of the dam of the Kolyma hydroelectric station during initial operation

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

The experience of operating the Kolyma hydrostation at a low head yielded considerable data for predicting the ice conditions in lower pools of hydrostations operating under harsh climatic conditions with daily and weekly regulation. This experience was used for refining the conditions during normal operation of the Kolyma hydrostation and for a feasibility study of the Ust'-Srednekan hydrostation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 2, pp. 34–36, February, 1990.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kozhevnikova, T.E., Sakharova, N.B. Ice conditions in pools of the dam of the Kolyma hydroelectric station during initial operation. Hydrotechnical Construction 24, 104–107 (1990). https://doi.org/10.1007/BF01424328

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01424328

Keywords

Navigation