Skip to main content
Log in

Construction joint grouting characteristics in the dam of the Zeya hydroelectric plant

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. É. S. Argal, Consolidation of Concrete Dams by Construction Joint Grouting [in Russian], Énergoatomizdat, Moscow (1987).

    Google Scholar 

  2. V. A. Ashikhmen and K. P. Kudrin, “Methods of heating the concrete of the dam of the Zeya hydroelectric plant for grouting of its joints,” Gidrotekh. Stroit., No. 8 (1978).

  3. A. P. Epifanov, V. I. Sil'nitskii, and V. S. Uryupin, “Operation of the dam of the Zeya hydroelectric plant during initial operation period,” Énerg. Stroit., No. 10 (1986).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 29–34, August, 1991.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Argal, É.S. Construction joint grouting characteristics in the dam of the Zeya hydroelectric plant. Hydrotechnical Construction 25, 492–499 (1991). https://doi.org/10.1007/BF01424130

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01424130

Keywords

Navigation