Skip to main content
Log in

Experience in the construction and operation of steel pressure pipelines of hydropower developments

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. A. R. Freishist, A. Kh. Khokharin, and A. M. Shor, Steel Pipelines of Hydroelectric Stations [in Russian], Énergoizdat, Moscow, 3rd ed. (1982), p. 248.

    Google Scholar 

  2. A. R. Freishist, Ya. G. Chobanis, and A. M. Shor, “Hydraulic tests of pipelines embedded in underground workings or concrete masses,” Gidrotekh. Stroit., No. 6, 12–14 (1979).

    Google Scholar 

  3. Instructions on the Design of Steel Pipelines of Hydraulic Structures: MU 34-747-76 Minénergo SSSR [in Russian], Informénergo, Moscow (1977), p. 217.

  4. M. A. Mostkov and A. A. Bashkirov, Calculation of Water Hammer [in Russian], Gosénergoizdat, Moscow-Leningrad (1952), p. 208.

    Google Scholar 

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 12–19, March, 1987.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Freishist, A.R. Experience in the construction and operation of steel pressure pipelines of hydropower developments. Hydrotechnical Construction 21, 123–134 (1987). https://doi.org/10.1007/BF01423999

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01423999

Keywords

Navigation