Skip to main content
Log in

Groundwater lowering in the foundation pit of the Kaisiadorys pumped-storage station

  • Engineering Design and Improvement of Civil Engineering Works
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. V. A. Nepomnyashchii, L. A. Titov, and A. M. Troyan, “Groundwater lowering in the foundation pit of the Kaisiadorys pumped-storage station,” Gidrotekh. Stroit., No. 3 (1986).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 11, pp. 13–17, November, 1988.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Nepomnyashchii, V.A., Akishin, V.Y., Titov, L.A. et al. Groundwater lowering in the foundation pit of the Kaisiadorys pumped-storage station. Hydrotechnical Construction 22, 632–638 (1988). https://doi.org/10.1007/BF01423959

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01423959

Keywords

Navigation