Antifiltration measures in base of rock-earth dam of the Hoabinh hydraulic development

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The obtained results of geophysical, seepage, and piezometric control, as well as analyses of similar structures constructed in the world practice, confirm the correctness of the design solutions and the high quality of the performed injection work for the river-channel curtain of the Hoabinh hydraulic development.

  2. 2.

    Definite advantages of the constructed curtain lie in complete exclusion, in the carrying out of the drilling and injection work, of scarce and costly bentonitic clays and in use of local clay materials.

  3. 3.

    The realized fundamental solutions for sequence in the construction of the grout curtains are effective for the adopted stage filling of the reservoir and startup of the first units of the hydroelectric plant.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, pp. 20–25, June, 1991.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Gal'perin, I.G., Né, T.F., Dmitriev, N.V. et al. Antifiltration measures in base of rock-earth dam of the Hoabinh hydraulic development. Hydrotechnical Construction 25, 327–334 (1991). https://doi.org/10.1007/BF01423757

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01423757

Keywords

Navigation