Abstract

In this paper we address the problem of scheduling unit time jobs in a flowshop to minimize makespan under a discrete renewable resource constraint. We propose algorithms having complexityO(n) for special cases of two machine and three machine problems. For the three machineN P-hard problem we develop a branch and bound procedure and several upper and lower bounds. We test the efficiency of the procedure and report our computational experience.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Baker KR (1974)Introduction to Sequencing and Scheduling. J. Wiley and Sons, New York

    Google Scholar 

  • Blazewicz J (1987) Selected Topics in Scheduling Theory.Annals of Discrete Mathematics 31: 1–60

    Google Scholar 

  • Blazewicz J, Kubiak W and Szwarcfiter J (1988) Scheduling Unit-Time Tasks on Flow-Shops Under Resource Constraints.Annals of Operations Research 16:255–266

    Google Scholar 

  • Blazewicz J, Lenstra JK and Rinnooy Kan AHG (1983) Scheduling Subject to Resource Constraints: Classification and Complexity.Discrete Applied Mathematics 5:11–22

    Google Scholar 

  • Blazewicz J, Cellary W, Slowinski R and Weglarz J (1986)Scheduling Under Resource Constraints:Deterministic Models, JC Baltzer, Basel

    Google Scholar 

  • Garey MR, Graham RL and Johnson DS (1976) Resource Constrained Scheduling as Generalized Bin Packing.Journal of Combinatorial Theory (A) 21:257–298

    Google Scholar 

  • Ibaraki T (1982) The Power of Upper and Lower Bounding Functions in Branch- and-bound Algorithms.Journal of Operations Research Society of Japan 25:292–320

    Google Scholar 

  • Krause KL, Shen VY and Schwetman HD (1975) Analysis of Several Task-Scheduling Algorithms for a Model of Multiprogramming Computer Systems.Journal of Association for Computing Machinery 22, No. 4:522–550

    Google Scholar 

  • Lawler IL, Lenstra JK and Rinnooy Kan AHG (1982) Recent Developments in Deterministic Sequencing and Scheduling: A Survey. In MAH Demster, JK Lenstra and AHG Rinnooy Kan, eds.,Deterministic and Stochastic Scheduling, Reidel, Dordrecht, pp. 35–73

    Google Scholar 

  • Lenstra JK and Rinnooy Kan AHG (1984) New Directions in Scheduling Theory.Operations Research Letters 2, No. 6:255–259

    Google Scholar 

  • Röck H (1984) Some New Results in No-wait Flow Shop Scheduling.Zeitschrift for Operations Research 28:1–16

    Google Scholar 

  • Slowinski R (1980) Two Approaches to Problems of Resource Allocation among Project Activities -A Comparative Study.Journal of Operational Research Society 31:711–723

    Google Scholar 

  • Slowinski R (1984) Preemptive Scheduling of Independent Jobs on Parallel Machines Subject to Financial Constraints.European Journal of Operational Research 15:366–373

    Google Scholar 

  • Yao AC (1975) Scheduling Unit-time Tasks with Limited Resources. In G Goos and J Hartmanis, eds.,Lecture Notes in Computer Science, Springer-Verlag, Berlin 24:17–36

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

Suna Kondakci was a visiting assistant professor at the Industrial Engineering Department, Purdue University, when the paper was revised.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Süral, H., Kondakci, S. & Erkip, N. Scheduling unit-time tasks in renewable resource constrained flowshops. ZOR - Methods and Models of Operations Research 36, 497–516 (1992). https://doi.org/10.1007/BF01416242

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01416242

Key words

Navigation