Conclusions
Measurements of the powers released in the characteristic zones of an OKB-955N electric furnace working space and also the change in them with an increase in voltage were measured for the first time.
The length of the arc was determined, and its discontinuity was established. The total time of the current pauses is 1.8 msec per half-period. Objective criteria guaranteeing the obtaining of a quality block were established. These criteria are a depth of the molten material of 500-60 mm and an impedance of the phase not exceeding 5·10−3 Ω. The use of the new method of measurements makes it possible to control the course of the melting process and to optimize its parameters.
Similar content being viewed by others
Literature cited
A. A. Parfenov, A. S. Mikulinskii, G. S. Belyaev, et al., Electrotermiya, No. 114, 5–6 (1971).
V. A. Bron, I. A. Stepanova, N. A. Mityushov, et al., Ogneupory, No. 2, 5–10 (1979).
K. V. Simonov, Ya. G. Gaponov, V. N. Koptelov, et al., Ogneupory, No. 4, 15–23 (1982).
K. V. Simonov, E. P. Mezentsev, V. N. Koptelov, et al., Ogneupory, No. 10, 14–20 (1982).
Yu. E. Voronin, K. A. Mironov, I. N. Kolesnik, and V. E. Laptev, Ogneupory, No. 9, 38–41 (1983).
S. G. Tresvyatskii and A. M. Cherepanov, Highly Refractory Materials and Parts of Oxides [in Russian], Metallurgizdat, Moscow (1964).
G. A. Sisoyan, The Electric Arc in an Electric Furnace [in Russian], Metallurgiya, Moscow (1961).
O. N. Bratkova, Welding Arc Power Sources [in Russian], Vysshaya Shkola, Moscow (1982).
Author information
Authors and Affiliations
Additional information
Translated from Ogneupory, No. 9, pp. 31–35, September, 1984.
Rights and permissions
About this article
Cite this article
Sivash, V.G., Sergienko, P.N., Vorob'ev, V.P. et al. Distribution of power in a three-phase electric furnace in the melting of periclase. Refractories 25, 528–533 (1984). https://doi.org/10.1007/BF01397836