Conclusions
The service conditions of the coke oven standpipe lining were studied and the basic reasons for failure of it were established. A method was developed for production of large concrete rings for lining of the standpipes. The lining of concrete rings has a number of advantages over the lining of shaped chamotte parts including the possibility of mechanization of production of the blocks and doing the lining work and economy in fuel and energy resources in production.
After 1–2 years of service the concrete ring lining of the standpipes is in good condition and defects are not observed.
Similar content being viewed by others
Literature cited
Coke and Chemical Handbook [in Russian], Vol. II, Metallurgiya, Moscow (1965).
É. M. Izraélit and M. S. Cheremnikh, Firing of Coke Ovens [in Russian], Metallurgizdat, Kharkov (1960).
I. M. Grushko, É. V. Degtyareva, G. N. Sobol', et al., Beton Zhelezobeton, No. 8, 27–28 (1983).
É. V. Degtyareva, L. S. Frolov, V. V. Primachenko, et al., Inventors' Cert. 1189834, Otkryt., Izobret., No. 41, 99 (1985).
E. V. Degtyareva, L. S. Frolova, V. V. Primachenko, et al., Inventors' Cert. 1154238, Otkryt. Izobret., No. 17, 81 (1985).
Author information
Authors and Affiliations
Additional information
Translated from Ogneupory, No. 5, pp. 49–52, May, 1988.
Rights and permissions
About this article
Cite this article
Frolova, L.S., Khalin, V.Y., Primachenko, V.V. et al. Lining of coke oven standpipes with concrete rings. Refractories 29, 325–329 (1988). https://doi.org/10.1007/BF01293373
Issue Date:
DOI: https://doi.org/10.1007/BF01293373