Conclusions
Powerful mining-transport equipment designed for operating the second phase of the Novoraisk Mine should be used for carrying out the mining-capital work, and this will reduce the time required for bringing the second section of the mine on stream.
Preliminary preparation of the tracks for the cut-out channels (removing the black earth and the potentially useful bed) will afford the possibility in the initial period of building and resolving the problems of mining-engineering stages of recultivation.
The proposed combined scheme for cutting out the channels will facilitate drying out of the section during the building of the quarry.
Similar content being viewed by others
Author information
Authors and Affiliations
Additional information
Translated from Ogneupory, No. 7, pp. 24–27, July, 1971.
Rights and permissions
About this article
Cite this article
Berezhnoi, I.N., Garmash, N.Z., Furta, A.S. et al. Using powerful mining-transport equipment for building the second stage of the Novoraisk Mine. Refractories 12, 436–438 (1971). https://doi.org/10.1007/BF01283061
Issue Date:
DOI: https://doi.org/10.1007/BF01283061