Skip to main content
Log in

Estimation of equipment reliability for the wet granulation of industrial carbon

  • New Machines and Equipment
  • Published:
Chemical and Petroleum Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. Yu. A. Fokin and V. A. Tufanov, Estimation of the Reliability of Power Supply Systems [in Russian], Énergoizdat, Moscow (1981).

    Google Scholar 

  2. A. S. Grunichaev, A. I. Mikhailov, and Ya. B. Shor, Tables for Calculating Reliability by the Weibull Distribution [in Russian], Standartov, Moscow (1974).

    Google Scholar 

  3. B. A. Kozlov and I. A. Ushakov, Handbook for Calculating the Reliability of Radio Electronic and Automation Equipment [in Russian], Sovetskoe Radio, Moscow (1975).

    Google Scholar 

Download references

Authors

Additional information

Translated from Khimicheskoe i Neftyanoe Mashinostroenie, No. 10, pp. 17–18, October, 1985.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Vladimirov, Y.I., Lyakh, N.G. & Blinkov, A.M. Estimation of equipment reliability for the wet granulation of industrial carbon. Chem Petrol Eng 21, 491–493 (1985). https://doi.org/10.1007/BF01149913

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01149913

Keywords

Navigation