Additional information
Translated from Khimicheskoe i Neftyanoe Mashinostroenie, No. 10, pp. 40–41, October, 1970.
Rights and permissions
About this article
Cite this article
Dolot, L.A. Organization of mechanized accounting in the zero-defect production and immediate product delivery system in departments of the frunze machinery factory in sumy. Chem Petrol Eng 6, 867 (1970). https://doi.org/10.1007/BF01145115
Issue Date:
DOI: https://doi.org/10.1007/BF01145115