Skip to main content
Log in

Optimizing the distribution of the annual production program of machine-building plants with a one part and small-lot character of production

  • Published:
Chemical and Petroleum Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. V. I. Dudorin, Mathematical Methods in the Planning of Machine-Building Production [in Russian], Mashgiz, Moscow (1963).

    Google Scholar 

  2. R. M. Petukhov and M. V. Nedlina, “Calendar planning of the output of parts in mass production by the method of linear programming,” Vestn. Mashinostr., No. 9, 69–76 (1961).

    Google Scholar 

  3. V. A. Petrov, Planning Production Line-Group Production [in Russian], Mashinostroenie, Moscow-Leningrad (1966).

    Google Scholar 

  4. V. N. Amitan and S. Sh. Maiorskii, The “ASU-Donetsk” Automated System of Control of a Machine-Building Plant [in Russian], Statistika, Moscow (1974).

    Google Scholar 

Download references

Authors

Additional information

Translated from Khimicheskoe i Neftyanoe Mashinostroenie, No. 6, pp. 34–35, June, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Beigel'zimer, M.G. Optimizing the distribution of the annual production program of machine-building plants with a one part and small-lot character of production. Chem Petrol Eng 13, 549–551 (1977). https://doi.org/10.1007/BF01144322

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01144322

Keywords

Navigation