Skip to main content
Log in

Operation of 250-ton open-hearth furnace with intensive oxygen blowing of the metal

  • In the Blast Furnace Plants of the Country
  • Published:
Metallurgist Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Makeyevka Metallurgical Plant. Donets Polytechnic Institute. Translated from Metallurg, No. 2, p. 24, February. 1974.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Nikitenko, V.V., Blashchuk, N.M. & Bornatskii, I.I. Operation of 250-ton open-hearth furnace with intensive oxygen blowing of the metal. Metallurgist 18, 119–120 (1974). https://doi.org/10.1007/BF01132582

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01132582

Keywords

Navigation