Additional information
Translated from Metallurg, No. 1, pp. 21–23, January, 1964
Rights and permissions
About this article
Cite this article
Peredisty, V.I. The operation of a single-channel 400-ton open-hearth furnace. Metallurgist 8, 24–26 (1964). https://doi.org/10.1007/BF01088068
Issue Date:
DOI: https://doi.org/10.1007/BF01088068