Skip to main content
Log in

Need for and requirements for a neutron irradiation facility for fusion materials testing

  • Overviews/Perspective
  • Published:
Journal of Fusion Energy Aims and scope Submit manuscript

Abstract

The construction and operation of an intense 14-MeV neutron source is essential for the development and eventual qualification of structural materials for a fusion reactor demonstration plant (DEMO). Because of the time required for materials development and the scale-up of materials to commercial production, a decision to build a neutron source should precede engineering design activities for a DEMO by at least 20 years. The characteristic features of 14-MeV neutron damage are summarized including effects related to cascade structure, transmutation production, and dose rate. The importance of a 14-MeV neutron source for addressing fundamental radiation damage issues, alloy development activities, and the development of an engineering database is discussed. For these considerations, the basic requirements and machine parameters are derived.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Materials for Fusion, Report to the Fusion Power Coordinating Committee by the Senior Advisory Panel (OECD/IEA, December 1986).

  2. T. C. Reuther (1989).J. Fusion Energy,8 (3).

  3. A. F. Rowcliffe, Summary of U.S. Neutron Workshop presented at IFMIF Workshop at San Diego (February 14–17, 1989).

  4. P. Schiller, Product of EC Workshop on a 14 MeV Neutron Source, Rome, October 22, 1988 (San Diego, February 14–17, 1989).

  5. S. Ishino (1988). Needs for 14 MeV Neutron Source for Material R&D. InProceedings of the Japan-U.S. Workshop P-119 on 14 MeV Neutron Source for Materials R&D Based on Plasma Devices, June 7–10, 1988, A. Miyahara and F. H. Coensgen, eds. (IPPJ-T-37, IPP Nagoya University), pp. 21–38.

  6. Technical Planning Activity Final Report (ANL/FPP-87-1, U.S. National Technical Information Service, January 1987).

  7. S. Amelinckx (1988).J. Nucl. Mater.,155–157. 3–7.

    Google Scholar 

  8. P. Schiller and J. Nihoul (1988).J. Nucl. Mater.,155–157, 41–48.

    Google Scholar 

  9. W. P. Eatherly (1987).Proceedings of the Japan-U.S. Workshop P-92 on Plasma Material Interaction/High Heat Flux Data Needs for the Next Step Ignition and Steady State Devices, January 26–30, 1987. A Miyahara and K. L. Wilson, eds. (IPPJ-AM-50, IPP, Nagoya University), pp. 424–432.

  10. R. S. Averback (1982).J. Nucl. Mater.,108–109, 33–45.

    Google Scholar 

  11. T. Muroga, S. Ishino, P. R. Okamoto, and H. Wiedersich (1984).J. Nucl. Mater.,122–123, 634–638.

    Google Scholar 

  12. N. H. Packan and K. Farrell (1979).J. Nucl. Mater.,85–86, 677–681.

    Google Scholar 

  13. T. Muroga, H. Watanabe, K. Araki, and N. Yoshida (1988).J. Nucl. Mater.,155–157, 1290–1295.

    Google Scholar 

  14. Technical Issues and Requirements of Experiment and Facilities for Fusion Nuclear Technology (FINESSE Phase I Report, PPG-909, UCLA-ENG-85-39, December 1985).

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ishino, S., Schiller, P. & Rowcliffe, A.F. Need for and requirements for a neutron irradiation facility for fusion materials testing. J Fusion Energ 8, 147–155 (1989). https://doi.org/10.1007/BF01051645

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01051645

Key words

Navigation