Skip to main content
Log in

Planning production capacity for centralized reconditioning of instruments

  • Published:
Measurement Techniques Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. R. E. Barlow and F. Proschan, Mathematical Theory of Reliability [in Russian], Sov. Radio, Moscow (1969).

    Google Scholar 

  2. L. N. Zakashanskii and L. G. Polyakova, Izmeritel'. Tekhn., No. 1 (1970).

  3. L. N. Zakashanskii, Izmeritel'. Tekhn., No. 8 (1969).

  4. Inventory of Operational and Auxiliary Inspection Equipment Necessary for Reconditioning and Verification of Controlling-Measuring Instruments [in Russian], Komitet Standartov, mer i izmeritel'nykh priborov, Moscow (1969).

Download references

Authors

Additional information

Translated from Izmeritel'naya Tekhnika, No. 3, pp. 70–71, March, 1971.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zakashanskii, L.N., Romanova, I.M. & Yakovlev, S.G. Planning production capacity for centralized reconditioning of instruments. Meas Tech 14, 469–471 (1971). https://doi.org/10.1007/BF00980296

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00980296

Keywords

Navigation