Skip to main content
Log in

Reconstruction of the skip bridge of a blast furnace with the use of an EDK 1000/1 crane

  • Cast Iron
  • Published:
Metallurgist Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Magnitogorsk Special Construction. Installation Administration No. 1 of the “Uraldomnaremont” Trust. Translated from Metallurg, No. 1, p. 26, January, 1989.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sankov, V.I., Valeev, V.T. & Ladin, M.N. Reconstruction of the skip bridge of a blast furnace with the use of an EDK 1000/1 crane. Metallurgist 33, 6–8 (1989). https://doi.org/10.1007/BF00750531

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00750531

Keywords

Navigation