Magnitogorsk Special Construction. Installation Administration No. 1 of the “Uraldomnaremont” Trust. Translated from Metallurg, No. 1, p. 26, January, 1989.
Rights and permissions
About this article
Cite this article
Sankov, V.I., Valeev, V.T. & Ladin, M.N. Reconstruction of the skip bridge of a blast furnace with the use of an EDK 1000/1 crane. Metallurgist 33, 6–8 (1989). https://doi.org/10.1007/BF00750531