Skip to main content
Log in

Improving the metal-heating regime in the rotary furnace of the 140 tube-production unit prior to piercing

  • Rolled Products
  • Published:
Metallurgist Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Nikopol' New Tube Plant. Translated from Metallurg, No. 8, p. 33, August, 1984.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Shevchenko, I.V., Toptunenko, É.S. & Zakharchenko, V.V. Improving the metal-heating regime in the rotary furnace of the 140 tube-production unit prior to piercing. Metallurgist 28, 291 (1984). https://doi.org/10.1007/BF00738000

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00738000

Keywords

Navigation