Skip to main content
Log in

Methods of establishing incentive funds and for stimulation of increase in production efficiency

  • Published:
Metallurgist Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

“Red October” Factory. Translated from Metallurg, No. 8, pp. 6–7, August, 1970.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Strel'nikov, V.M., Vakulin, N.S. Methods of establishing incentive funds and for stimulation of increase in production efficiency. Metallurgist 14, 482–483 (1970). https://doi.org/10.1007/BF00736512

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00736512

Keywords

Navigation