Skip to main content
Log in

Blast-furnace repair of category III in 36 hours

  • Cast Iron
  • Published:
Metallurgist Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Cherepovets Division of the Trust “Tentrdomnaremont.” Translated from Metallurg, No. 7, pp. 8–10, July, 1967.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kacherov, S.P., Koltover, K.N. & Denisov, I.G. Blast-furnace repair of category III in 36 hours. Metallurgist 11, 363–365 (1967). https://doi.org/10.1007/BF00735257

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00735257

Navigation