Skip to main content
Log in

Estimation of the output of mining and transporting equipment when planning and organizing mining

  • Open-Pit and Underground Mining
  • Published:
Journal of Mining Science Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. Instructions on Calculating the Standard Operating Output of Excavators and Continuous Machine Sets [in Russian], Kiev (1980).

  2. Methods of Calculating the Standard Output of Excavators and Continuous Machine Sets [in Russian], Kiev (1991).

  3. Reliability of Engineering Systems (Handbook) [in Russian], Radio i Svyaz', Moscow (1985).

  4. D. Phillips and A. Garcia-Dias, Network Analysis Methods [Russian translation], Mir, Moscow (1981).

    Google Scholar 

  5. P. Jensen and S. Barnes, Flow Programming [Russian translation], Radio i Svyaz', Moscow (1984).

    Google Scholar 

Download references

Authors

Additional information

Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk. Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 70–73, July–August, 1992.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kortelev, O.B., Kuznetsov, A.S., Sychev, V.A. et al. Estimation of the output of mining and transporting equipment when planning and organizing mining. J Min Sci 28, 368–370 (1993). https://doi.org/10.1007/BF00735106

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00735106

Navigation