Additional information
Dnieper Blast Furnace Repair Combine. Translated from Metallurg, No. 4,pp. 8–9, April 1969.
Rights and permissions
About this article
Cite this article
Zalkind, A.S. Replacing the charging apparatus of a 2700 m3 blast furnace. Metallurgist 13, 215–216 (1969). https://doi.org/10.1007/BF00733951
Issue Date:
DOI: https://doi.org/10.1007/BF00733951