Skip to main content
Log in

Control of the quality of work at the K. Liebknecht Plant

  • Tenth Five-Year Plan — Efficiency and Quality
  • Published:
Metallurgist Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

K. Liebknecht Pipe Plant (Nizhnedneprovsk). Translated from Metallurg, No. 1, pp. 7–8, January, 1979.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Esaulov, A.T., Grinev, A.F., Yaroshenko, I.G. et al. Control of the quality of work at the K. Liebknecht Plant. Metallurgist 23, 13–15 (1979). https://doi.org/10.1007/BF00733927

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00733927

Navigation