Skip to main content
Log in

Planning the work of periodic ballmills in continuous ceramic production

  • Published:
Glass and Ceramics Aims and scope Submit manuscript

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. E. E. Dudnikov, Typical Problems for Operational Control of Continuous Production [in Russian], Énergiya, Moscow (1979), p. 272.

    Google Scholar 

  2. E. E. Dudnikov, Avtomatika Telemekhanika, No. 4, 108–131 (1973).

    Google Scholar 

  3. R. F. H. Musier and L. B. Evans, Computers Chem. Eng.,13, No. 1–2, 229–238 (1989).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Steklo i Keramika, No. 10, pp. 15–17, October, 1991.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Plyutto, V.P., Bag, F.K., Loan, D.T. et al. Planning the work of periodic ballmills in continuous ceramic production. Glass Ceram 48, 447–452 (1991). https://doi.org/10.1007/BF00678666

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00678666

Keywords

Navigation