Skip to main content
Log in

Optimizing the composition of the maintenance team by multistep grid analysis

  • Production Economics And Organization
  • Published:
Fibre Chemistry Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. V.E.Samsonov, Fibre Chemistry, No.6 (1969).

  2. Kh.Mamedov, M.Kurbanov, and Kh.Mursalidze, Organization of Equipment Overhaul and Modernization (in Russian), Azerneshr (1966).

  3. F.F.Bezdudnyi, E.S.Shapiro, and P.Ya.Andreev, Grid Methods of Planning and Control in the Textile and Light Industries (in Russian), Legkaya Industriya (1969).

  4. R.V.Miller, The PERT System of Control (in Russian), Ekonomika (1965).

  5. S.I.Zukhovitskii and I.A.Radchik, Mathematical Methods of Grid Planning (in Russian), Nauka (1965).

Download references

Authors

Additional information

Leningrad Branch of the All-Union Scientific Research Institute for Man-Made Fibre; Kiev Man-Made Fibre Combine. Translated from Khimicheskie Volokna, No.3, pp. 53 – 55, May – June, 1973.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Fain, S.M., Arinchenkova, N.V., Shapiro, E.S. et al. Optimizing the composition of the maintenance team by multistep grid analysis. Fibre Chem 5, 313–315 (1973). https://doi.org/10.1007/BF00546062

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00546062

Keywords

Navigation