This paper aims at analysing the impact of the design phase on performance in public works execution. In the extant literature, the design phase is recognised as one of the possible determinants of inefficiency in public works execution. Despite this, the empirical evidence on the topic remains scarce. Using a large dataset of public works awarded in Italy in 2008–2014, we investigate empirically the relationship between the different choices made in the design phase and performance in public works execution. Our empirical findings show that the presence of an external designer is associated with higher cost and time renegotiations. The issue is especially relevant for small municipalities that rely more heavily on external designers, possibly because of the limited expertise available within their technical offices. Furthermore, regardless of the way the design is managed (in-house or not), we find that design and build contracts do not influence the efficient provision of public works. From a public policy perspective, our findings offer some support to the recent reform of the Italian public procurement regulation that has introduced new accreditation requirements for contracting authorities.

Keywords

Public procurement Performance in contract execution Design phase internal/external designer Design and build contracts 

JEL Classification

L51 H57 

Notes

Acknowledgements

We wish to thank two anonymous referees for their careful review, and the managing editor, Professor Roberta Rabellotti, for her helpful advice. The usual disclaimers apply.

References

  1. Abadie A, Imbens G (2002) Simple and bias-corrected matching estimators. Technical report, Department of Economics, University of California, Berkeley. https://eml.berkeley.edu/~mcfadden/e242_f01/imbens.pdf. Accessed 12 Sept 2018
  2. Acconcia A, Cantabene C (2008) A big push to deter corruption: evidence from Italy. Giornale degli Economisti e Annali di Economia 67(121):75–102Google Scholar
  3. AVCP (2008) Relazione al Parlamento per l’anno 2007. Autorità di Vigilanza sui Contratti Pubblici di Lavori, Servizi e Forniture, RomaGoogle Scholar
  4. Bajari P, Tadelis S (2001) Incentives versus transaction costs: a theory of procurement contracts. RAND J Econ 32(3):387–407CrossRefGoogle Scholar
  5. Bajari P, McMillan R, Tadelis S (2009) Auctions versus negotiations in procurement: an empirical analysis. J Law Econ Organ 25:372–399CrossRefGoogle Scholar
  6. Bucciol A, Chillemi O, Palazzi G (2013) Cost overrun and auction format in small size public works. Eur J Polit Econ 30:35–42CrossRefGoogle Scholar
  7. Cavalieri M, Guccio C, Rizzo I (2017) On the role of environmental corruption in healthcare infrastructures: an empirical assessment for Italy using DEA with truncated regression approach. Health Policy 121(5):515–524CrossRefGoogle Scholar
  8. Cavalieri M, Guccio C, Rizzo I (2018) Does corruption and the institutional characteristics of the contracting authorities affect the execution of healthcare infrastructures? An empirical investigation for Italy. J Public Procure 18(2):148–164CrossRefGoogle Scholar
  9. Coase RH (1937) The nature of the firm. Economica 4(November):386–405CrossRefGoogle Scholar
  10. Coviello D, Gagliarducci S (2010) Tenure in office and public procurement. CEIS Tor Vergata Research paper series, no. 179Google Scholar
  11. Coviello D, Guglielmo A, Spagnolo G (2017) The effect of discretion on procurement performance. Manag Sci 64(2):715–738CrossRefGoogle Scholar
  12. Coviello D, Moretti L, Spagnolo G, Valbonesi P (2018) Court efficiency and procurement performance. Scand J Econ 120(3):826–858CrossRefGoogle Scholar
  13. D’Alpaos C, Moretto M, Valbonesi P, Vergalli S (2009) It is never too late: optimal penalty for investment delay in Italian public procurement contracts. Nota di Lavoro 78.2009. Fondazione Eni EnricoMattei, Institutions and Markets Series, Milan. https://www.feem.it/m/publications_pages/20091118174852478-09.pdf. Accessed 15 July 2018
  14. Decarolis F (2014) Awarding price, contract performance, and bids screening: evidence from procurement auctions. Am Econ J Appl Econ 6(1):108–132CrossRefGoogle Scholar
  15. Decarolis F, Giorgiantonio C (2015) Local public procurement regulations: the case of Italy. Int Rev Law Econ 43:209–226CrossRefGoogle Scholar
  16. Decarolis F, Palumbo G (2011) La rinegoziazione dei contratti di lavori pubblici: un’analisi teorica e empirica. Banca d’Italia, Le infrastrutture in Italia: dotazione, programmazione, realizzazione. In: Workshops and conferences, Banca d’Italia, Rome, No. 7, pp 489–518. https://www.bancaditalia.it/pubblicazioni/collana-seminari-convegni/2011-0007/7_infrastrutture_italia.pdf. Accessed 18 Sept 2018
  17. Decarolis F, Palumbo G (2015) Renegotiation of public contracts: an empirical analysis. Econ Lett 132:77–81CrossRefGoogle Scholar
  18. Di Giovanni L (2017) Recent Italian public law reforms. Eur Public Law 23(3):471–486Google Scholar
  19. Finocchiaro Castro M, Guccio C, Rizzo I (2014) An assessment of the waste effects of corruption on infrastructure provision. Int Tax Public Financ 21(4):813–843CrossRefGoogle Scholar
  20. Flyvberg B (2005) Policy and planning for large infrastructure projects: problems, causes, cures. World Bank Policy Research Working Paper No. 3781, World Bank, Washington, DCGoogle Scholar
  21. Flyvbjerg B, Holm MS, Buhl S (2002) Underestimating costs in public works projects: error or lie? J Am Plan Assoc 68(3):279–295CrossRefGoogle Scholar
  22. Ganuza JJ (2007) Competition and cost overruns in procurement. J Ind Econ 55(4):633–660CrossRefGoogle Scholar
  23. Golden MA (2003) Electoral connections: the effects of the personal vote on political patronage, bureaucracy and legislation in postwar Italy. Br J Polit Sci 33(2):189–212CrossRefGoogle Scholar
  24. Guasch JL (2004) Granting and renegotiating: infrastructure concessions: doing it right. The World Bank, Washington, DCCrossRefGoogle Scholar
  25. Guccio C, Pignataro G, Rizzo I (2008) Adaptation costs in public works procurement in Italy. In: Enhancing best practices in public procurement, proceedings of the 3rd international public procurement conference. NEVI/PIANOo, The Netherlands, pp 28–30Google Scholar
  26. Guccio C, Pignataro G, Rizzo I (2009) Selezione dei fornitori e incentivi alla rinegoziazione in contratti incompleti: rilevanza empirica nel settore dei lavori pubblici. Rivista Italiana degli Economisti 14(2):311–344Google Scholar
  27. Guccio C, Pignataro G, Rizzo I (2012a) Measuring the efficient management of public works contracts: a non-parametric approach. J Public Procure 12(4):528–546CrossRefGoogle Scholar
  28. Guccio C, Pignataro G, Rizzo I (2012b) Determinants of adaptation costs in procurement: an empirical estimation on Italian public works contracts. Appl Econ 44(15):1891–1909CrossRefGoogle Scholar
  29. Guccio C, Pignataro G, Rizzo I (2014a) Evaluating the efficiency of public procurement contracts for cultural heritage conservation works in Italy. J Cult Econ 38(1):43–70CrossRefGoogle Scholar
  30. Guccio C, Pignataro G, Rizzo I (2014b) Do local governments do it better? Analysis of time performance in the execution of public works. Eur J Polit Econ 34:237–252CrossRefGoogle Scholar
  31. Hale DR, Shrestha PP, Gibson GE, Migliaccio GC (2009) Empirical comparison of design/build and design/bid/build project delivery methods. J Constr Eng Manag 135(7):579–587CrossRefGoogle Scholar
  32. Huettner F, Sunder M (2012) Axiomatic arguments for decomposing goodness of fit according to Shapley and Owen values. Electron J Stat 6:1239–1250CrossRefGoogle Scholar
  33. Ibbs CW, Kwak YH, Ng T, Odabasi AM (2003) Project delivery systems and project change: quantitative analysis. J Constr Eng Manag 129(4):382–387CrossRefGoogle Scholar
  34. Iimi A (2009) Infrastructure procurement and ex post cost adjustments. Evidence from ODA financed road procurement in Africa. In: The World Bank international conference on infrastructure economics and development, Toulouse, France. http://siteresources.worldbank.org/DEC/Resources/84797-1257266550602/IimiA.pdf. Accessed 12 Sept 2018
  35. Klemperer P (1999) Auction theory: a guide to the literature. J Econ Surv 13(3):227–286CrossRefGoogle Scholar
  36. Konchar M, Sanvido V (1998) Comparison of U.S. project delivery systems. J Constr Eng Manag 124(6):435–444CrossRefGoogle Scholar
  37. Lewis G, Bajari P (2011) Procurement contracting with time incentives: theory and evidence. Q J Econ 126(3):1173–1211CrossRefGoogle Scholar
  38. Minchin R Jr, Li X, Issa R, Vargas G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. J Constr Eng Manag 139(10):04013007CrossRefGoogle Scholar
  39. Molenaar KR, Songer AD, Barash M (1999) Public-sector design/build evolution and performance. J Manag Eng 15(2):54–62CrossRefGoogle Scholar
  40. OECD (2013) Discussion paper on public procurement performance measures. In: OECD meeting of leading practitioners on public procurement, GOV/PGC/ETH(2013)1, Organisation for Economic Co-operation and Development, Conference Centre, Paris. http://www.oecd.org/gov/ethics/Discussion%20paper%20on%20public%20procurement%20performance%20measures%20GOV_PGC_ETH_2012_1.pdf. Accessed 20 June 2018
  41. OLAF (2013) Identifying and reducing corruption in public procurement in the EU. The European Anti-Fraud Office, European Commission, Bruxelles. https://ec.europa.eu/anti-fraud/sites/antifraud/files/docs/body/identifying_reducing_corruption_in_public_procurement_en.pdf. Accessed 12 June 2018
  42. Park J, Kwak YH (2017) Design-bid-build (DBB) vs. design-build (DB) in the U.S. public transportation projects: the choice and consequences. Int J Proj Manag 35(3):280–295CrossRefGoogle Scholar
  43. Piga G (2011) A fighting chance against corruption in public procurement. In: Rose-Ackerman S, Søreide T (eds) International handbook on the economics of corruption, vol 2. Edward Elgar Publishing, Cheltenham, pp 141–181Google Scholar
  44. Rizzo I (2013) Efficiency and integrity issues in public procurement performance. J Public Financ Public Choice XXXI:77–94 (1-3/2013) Google Scholar
  45. Rosner JW, Tal Jr, Alfred E, West CJ (2009) Analysis of the design-build delivery method in air force construction projects. J Constr Eng Manag 135(8):710–717CrossRefGoogle Scholar
  46. Shane J, Bogus S, Molenaar K (2013) Municipal water/wastewater project delivery performance comparison. J Manag Eng 29(3):251–258CrossRefGoogle Scholar
  47. Sheather SJ, Jones MC (1991) A reliable data-based bandwidth selection method for kernel density estimation. J Roy Statist Soc Ser B 53:683–690Google Scholar
  48. Shrestha PP, Fernane JD (2017) Performance of design-build and design-bid-build projects for public universities. J Constr Eng Manage 143(3):04016101CrossRefGoogle Scholar
  49. Shrestha P, O’Connor T, Gibson G (2012) Performance comparison of large design-build and design-bid-build highway projects. J Constr Eng Manag 138(1):1–13CrossRefGoogle Scholar
  50. Wand MP, Jones MC (1995) Kernel smoothing. Chapman and Hall Ltd., LondonCrossRefGoogle Scholar
  51. Warren P (2014) Contracting officer workload, incomplete contracting, and contractual terms. Rand J Econ 45(2):395–421CrossRefGoogle Scholar
  52. Williamson O (1979) Transaction-cost economics: the governance of contractual relations. J Law Econ 22(2):233–261CrossRefGoogle Scholar

Copyright information

© Società Italiana degli Economisti (Italian Economic Association) 2019

Authors and Affiliations

  1. 1.Department of Economics and BusinessUniversity of CataniaCataniaItaly
  2. 2.University of MessinaMessinaItaly

Personalised recommendations