Advertisement

Mining corporate portfolio optimization model with company’s operational performance level and international risk

  • Achille N. Njike
  • Mustafa KumralEmail author
Original Paper
  • 4 Downloads

Abstract

The mineral industry has encountered severe price turbulence in the recent years. A new portfolio management strategy will help to actively deal with this turbulence, corporate mining organizations need to improve their decision-making processes associated with capital allocation to new proposed projects. The proposed approach will help mining corporates to improve their capital allocation strategies to new projects in such a way as to consider operational performance in the prioritization of business-related spending on capital projects. The problem is formulated as the minimization of the risk at the desired return under constraints of operational performance requirement of the project’s initiators product group. This optimization model is solved using MATLAB. The results show that, on top of the NPV criteria, the more you diversify the portfolio, the more you potentially increase the corporate portfolio return and the more you slightly increase the risk for correlated projects. These results also show that as the performance of the product group increases, the number of approved projects at the corporate level also increases.

Keywords

Mining projects Portfolio Optimization Risks Returns Performance 

Notes

References

  1. Bhappu R, Guzman J (1995) Mineral investment decision making. Eng Min J 7:36–38Google Scholar
  2. Bowman C, & Ambrosini V (2000) Value creation versus value capture: towards a coherent definition of value in strategy. Br J Manag, 11(1), 1–15. Doi:  https://doi.org/10.1111/1467-8551.00147 -. (2016). Commodity Price Index - Annual. Retrieved from http://www.bankofcanada.ca/rates/price-indexes/bcpi/commodity-price-index-annual/
  3. Chang TJ, Meade N, Beasley JE, Sharaiha YM (2000) Heuristics for cardinality constrained portfolio optimisation. Comput Oper Res 27(13):1271–1302.  https://doi.org/10.1016/S0305-0548(99)00074-X CrossRefGoogle Scholar
  4. Clemen RT (2000) Assessing dependence: some experimental results. Manag Sci 46:1100–1115CrossRefGoogle Scholar
  5. Collan M, Savolainen J, Luukka P (2017) Investigating the effect of price process selection on the value of a metal mining asset portfolio. Miner Econ 30(2):107–115.  https://doi.org/10.1007/s13563-017-0102-2 CrossRefGoogle Scholar
  6. Herring RJ, School W (1986) Managing international risk: essays commissioned in honor of the centenary of the Wharton School, University of Pennsylvania. Cambridge University PressGoogle Scholar
  7. Humphreys D (2018) The mining industry after the boom.  https://doi.org/10.1007/s13563-018-0155-x -(2016). Iron Ore Price. Retrieved from http://www.indexmundi.com/commodities/?commodity=iron-ore&months=60
  8. Ives G. (2016) Riding the waves. Tracking the trend 2016—the top ten issues mining companies will face in the coming year, 52Google Scholar
  9. Markowitz H (1952) Portfolio selection. J Financ 7(1):77–91.  https://doi.org/10.1111/j.1540-6261.1952.tb01525.x Google Scholar
  10. Markowitz H (1959) Portfolio selection; efficient diversification of investments. Wiley, New YorkGoogle Scholar
  11. Markowitz H (2008) Harry Markowitz: selected works. World Scientific, Singapore. (2016). Going lean—operational excellence remains front and centre. Tracking the Trend 2016—the top ten issues mining companies will face in the coming year, 52 p. In: Retrieve from https://www2.deloitte.com/ge/en/pages/energy-and-resources/articles/tracking-the-trends.html Google Scholar
  12. Minsky HP (2008) Stabilizing an unstable economy. McGraw Hill Professional, New York 350 pGoogle Scholar
  13. Raffaini E (2016) Tracking the trends: The top 10 issues mining companies will face in the coming years. Deloitte. https://www2.deloitte.com/content/dam/Deloitte/global/Documents/Energy-and-Resources/gx-ertracking-the-trends-2016.pdf. Accessed 16 June 2018
  14. Rahmanpour M, & Osanloo M (2015) Long term planning in open pit mines in presence of commodity price uncertainty. Proceedings of the 24th International Mining Congress and Exhibition of Turkey, IMCET 2015, 660–667. AntalyaGoogle Scholar
  15. Rahmanpour M, Osanloo M (2016) Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty. J South Afr Inst Min Metall 116(3):229–236.  https://doi.org/10.17159/2411-9717/2016/v116n3a3 Google Scholar
  16. Rardin RL (2016) Optimization in operations research. Pearson Education, London, UKGoogle Scholar
  17. Sauvageau M, Kumral M (2017) Kalman filtering-based approach for project valuation of an iron ore mining project through spot price and long-term commitment contracts. Nat Resour Res 26(3):303–317.  https://doi.org/10.1007/s11053-017-9329-4 CrossRefGoogle Scholar
  18. Sauvageau M, Kumral M (2018) Cash flow at risk valuation of mining project using Monte Carlo simulations with stochastic processes calibrated on historical data. Eng Econ 63(3):171–187.  https://doi.org/10.1080/0013791X.2017.1413150 CrossRefGoogle Scholar
  19. Taylor HK (1986) Rates of working of mines—a simple rule of thumb. Trans Institution Mining Metall Sect A 95:A203–A204Google Scholar
  20. Wirth H, Kubacki K, Napierała K (2013) Value creation of a mining company through international expansion. Miner Econ 25(2–3):71–76.  https://doi.org/10.1007/s13563-012-0025-x CrossRefGoogle Scholar
  21. Xie CF, Xu L, Xu LX (2016) The reliability and economic analysis on system connection mode. In: Pan JS, Lin JW, Wang CH, Jiang X (eds) International Conference on Genetic and Evolutionary Computing. Advances in Intelligent Systems and Computing 536:63–71Google Scholar
  22. Xu XC, Gu XW, Wang Q, Liu JP, Wang J (2014) Ultimate pit optimization with ecological cost for open pit metal mines. Trans Nonferrous Metals Soc China 24(5):1531–1537.  https://doi.org/10.1016/s1003-6326(14)63222-2 CrossRefGoogle Scholar
  23. Xue Q, Wang Z, Liu SJ, Zhao D (2014) An improved portfolio optimization model for oil and gas investment selection. Pet Sci 11(1):181–188.  https://doi.org/10.1007/s12182-014-0331-8 CrossRefGoogle Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Department of Mining and Material Engineering, Faculty of EngineeringMcGill UniversityMontréalCanada

Personalised recommendations