KI - Künstliche Intelligenz

, Volume 30, Issue 1, pp 101–105 | Cite as

Interview with David E. Smith

Interview

References

  1. 1.
    Aghevli A, Bachmann A, Bresina J, Greene K, Kanefsky B, Kurien J, McCurdy M, Morris P, Pyrzak G, Ratterman C, Vera A, Wragg S (2007) Planning applications for three Mars missions with ensemble. In: Proceedings of the 5th international workshop on planning and scheduling for space (IWPSS)Google Scholar
  2. 2.
    Barreiro J, Do M, Smith DE (2014) Intelligent UAS sense-and-avoid utilizing global constraints. In: Proceedings of the ICAPS-14 scheduling and planning applications workshop (SPARK)Google Scholar
  3. 3.
    Bresina J (2015) Activity planning for a lunar orbital mission. In: Proceedings of the 27th conference on innovative applications of artificial intelligence (IAAI). AAAI Press, pp 3887–3895Google Scholar
  4. 4.
    Bresina J, Jónsson A, Morris P, Rajan K (2005) Activity planning for the Mars exploration rovers. In: Proceedings of the 15th international conference on automated planning and scheduling (ICAPS). AAAI Press, pp 40–49Google Scholar
  5. 5.
    Bresina J, Jónsson A, Morris P, Rajan K (2005) Mixed-initiative planning in MAPGEN: capabilities and shortcomings. In: Proceedings of the ICAPS-05 workshop on mixed-initiative planning and schedulingGoogle Scholar
  6. 6.
    Bresina J, Morris P (2007) Mixed-initiative planning in space mission operations. AI Mag 28(2):75–88Google Scholar
  7. 7.
    Buckley M, Fertig K, Smith DE (1992) Design Sheet: An environment for facilitating flexible trade studies during conceptual design. In: Proceedings of the 1992 aerospace design conference. American Institute of Aeronautics and Astronautics (AIAA)Google Scholar
  8. 8.
    Dao AQ, Koltai K, Cals S, Brandt S, Lachter J, Matessa M, Smith DE, Battiste V, Johnson W (2015) Evaluation of a recommender system for single pilot operations. In: Proceedings of the 6th international conference on applied human factors and ergonomics (AHFE). ElsevierGoogle Scholar
  9. 9.
    Domshlak C, Mirkis V (2015) Deterministic oversubscription planning as heuristic search: abstractions and reformulations. JAIR 52:97–169MathSciNetMATHGoogle Scholar
  10. 10.
    E-Martín Y, R-Moreno M, Smith DE (2015) A fast goal-recognition technique based on interaction estimates. In: Proceedings of the twenty-fourth international joint conference on artificial intelligence (IJCAI). AAAI Press, pp 761–768Google Scholar
  11. 11.
    Fox J, McCurdy M (2007) Activity planning for Phoenix Mars Lander mission. In: Proceedings of the IEEE aerospace conference. IEEE, pp 1–13Google Scholar
  12. 12.
    Fox M, Long D (2003) PDDL2.1: An extension to PDDL for expressing temporal planning domains. JAIR 20:61–124MATHGoogle Scholar
  13. 13.
    Lyons J, Koltai K, Ho N, Johnson W, Smith DE, Shively RJ (2015) Engineering trust in complex automated systems. Ergon Des (in press)Google Scholar
  14. 14.
    Meuleau N, Neukom C, Plaunt C, Smith, DE, Smith T (2011) The Emergency Landing Planner experiment. In: Proceedings of the ICAPS-11 scheduling and planning applications workshop (SPARK)Google Scholar
  15. 15.
    Meuleau N, Plaunt C, Smith DE, Smith T (2009) An emergency landing planner for damaged aircraft. In: Proceedings of the 21st innovative applications of artificial intelligence conference (IAAI). AAAI Press, pp 114–121Google Scholar
  16. 16.
    Micheli A, Do M, Smith DE (2015) Compiling away uncertainty in strong temporal planning with uncontrollable durations. In: Proceedings of the twenty-fourth international joint conference on artificial intelligence (IJCAI). AAAI Press, pp 1631–1637Google Scholar
  17. 17.
    Peot M, Smith DE (1992) Conditional nonlinear planning. In: Proceedings of the 1st international conference on artificial intelligence planning systems (AIPS). Morgan Kaufmann Publishers Inc., pp 189–197Google Scholar
  18. 18.
    Reddy S, Fertig K, Smith DE (1996) Constraint management methodology for conceptual design tradeoff studies. In: Proceedings of the 1996 ASME design engineering technical conferences and computers in engineering conferenceGoogle Scholar
  19. 19.
    Reddy S, Frank J, Iatauro M, Boyce M, Kürklü E, Ai-Chang M, Jónsson A (2011) Planning solar array operations on the International Space Station. ACM Trans Intell Syst Technol (TIST) 2(4):41Google Scholar
  20. 20.
    Smith DE (2004) Choosing objectives in over-subscription planning. In: Proceedings of the 14th international conference on automated planning and scheduling (ICAPS). AAAI Press, pp 393–401Google Scholar
  21. 21.
    Smith DE (2012) Planning as an iterative process. In: Proceedings of the 26th AAAI conference on artificial intelligence. AAAI Press, pp 2180–2185Google Scholar
  22. 22.
    Smith DE, Weld D (1999) Temporal planning with mutual exclusion reasoning. In: Proceedings of the 16th international joint conference on artificial intelligence (IJCAI). Morgan Kaufmann, pp 326–333Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2015

Authors and Affiliations

  1. 1.Institute of Artificial IntelligenceUlm UniversityUlmGermany

Personalised recommendations