The task of delay management is to decide whether connecting trains should wait for delayed feeder trains or depart on time in order to minimize the passengers’ delay. To estimate the effect of the wait-depart decisions on the travel times, most delay management models assume that passengers’ routes are predefined. However, in practice, passengers can adapt their routes to the wait-depart decisions and arising changes in the timetable. For this reason, in this paper we assume that passengers’ demand is given in form of pairs of origins and destinations (OD-pairs) and take wait-depart decisions and decisions on passengers’ routes simultaneously.

This approach, called delay management with re-routing, was introduced in Dollevoet et al. (Transp. Sci. 46(1):74–89, 2012) and we build our research upon the results obtained there. We show that the delay management problem with re-routing is strongly NP-hard even if there is only one OD-pair. Furthermore, we prove that even if there are only two OD-pairs, the problem cannot be approximated with constant approximation ratio unless P=NP. However, for the case of only one OD-pair we propose a polynomial-time algorithm. We show that our algorithm finds an optimal solution if there is no reasonably short route from origin to destination which requires a passenger to enter the same train twice. Otherwise, the solution found by the algorithm is a 2-approximation of an optimal solution and the estimated travel time is a lower bound on the objective value.

Keywords

Delay management Routing NP-completeness Approximation 

Supplementary material

12469_2013_69_MOESM1_ESM.pdf (477 kb)
(PDF 478 kB)

References

  1. Adenso-Díaz B, Oliva González M, González-Torre P (1999) On-line timetable re-scheduling in regional train services. Transp Res, Part B, Methodol 33:387–398 CrossRefGoogle Scholar
  2. Bauer R (2010) Theory and engineering for shortest paths and delay management. PhD thesis, Karlsruher Institut für Technologie Google Scholar
  3. Berger A, Hoffmann R, Lorenz U, Stiller S (2011) Online railway delay management: hardness, simulation and computation. Simulation 87(7):616–629 CrossRefGoogle Scholar
  4. Borndörfer R, Grötschel M, Pfetsch ME (2008) Models for line planning in public transport. In: Hickman M, Mirchandani P, VoßS (eds) Computer-aided systems in public transport. Lecture notes in economics and mathematical systems, vol 600. Springer, Berlin, pp 363–378 CrossRefGoogle Scholar
  5. Cordeau JF, Toth P, Vigo D (1998) A survey of optimization models for train routing and scheduling. Transp Sci 32(4):380–404 CrossRefGoogle Scholar
  6. Corman F, D’Ariano A, Pacciarelli D, Pranzo M (2012) Bi-objective conflict detection and resolution in railway traffic management. Transp Res, Part C, Emerg Technol 20(1):79–94 CrossRefGoogle Scholar
  7. de Vries R, De Schutter B, De Moor B (1998) On max-algebraic models for transportation networks. In: Proceedings of the international workshop on discrete event systems, Cagliari, Italy, pp 457–462 Google Scholar
  8. Dollevoet T, Schmidt M, Schoebel A (2011) Delay management including capacities of stations. In: Caprara A, Kontogiannis S (eds) Proceedings of ATMOS, OASIcs, vol 20. Schloss Dagstuhl–Leibniz-Zentrum für Informatik, Dagstuhl, Germany, pp 88–99 Google Scholar
  9. Dollevoet T, Huisman D, Schmidt M, Schöbel A (2012) Delay management with re-routing of passengers. Transp Sci 46(1):74–89 CrossRefGoogle Scholar
  10. Fischetti M, Monaci M (2009) Light robustness. In: Ahuja RK, Möhring R, Zaroliagis C (eds) Robust and online large-scale optimization. Lecture note on computer science, vol 5868. Springer, Berlin, pp 61–84 CrossRefGoogle Scholar
  11. Fischetti M, Salvagnin S, Zanette A (2009) Fast approaches to improve the robustness of a railway timetable. Transp Sci 43:321–335 CrossRefGoogle Scholar
  12. Garey M, Johnson D (1979) Computers and intractability—a guide to the theory of NP-completeness. Freeman, San Francisco Google Scholar
  13. Gatto M, Glaus B, Jacob R, Peeters L, Widmayer P (2004) Railway delay management: exploring its algorithmic complexity. In: Proceedings of 9th Scandinavian Workshop on Algorithm Theory (SWAT). Lecture notes in computer science, vol 3111. Springer, Berlin, pp 199–211 Google Scholar
  14. Gatto M, Jacob R, Peeters L, Schöbel A (2005) The computational complexity of delay management. In: Kratsch D (ed) Graph-theoretic concepts in computer science: 31st international workshop (WG 2005). Lecture notes in computer science, vol 3787. Springer, Berlin Google Scholar
  15. Gatto M, Jacob R, Peeters L, Widmayer P (2007) On-line delay management on a single train line. In: Algorithmic methods for railway optimization. Lecture notes in computer science, vol 4359. Springer, Berlin, pp 306–320 CrossRefGoogle Scholar
  16. Ginkel A, Schöbel A (2007) To wait or not to wait? The bicriteria delay management problem in public transportation. Transp Sci 41(4):527–538 CrossRefGoogle Scholar
  17. Goerigk M, Schöbel A (2010) An empirical analysis of robustness concepts for timetabling. In: Erlebach T, Lübbecke M (eds) Proceedings of ATMOS, OASIcs, vol 14. Schloss Dagstuhl–Leibniz-Zentrum für Informatik, Dagstuhl, Germany, pp 100–113 Google Scholar
  18. Goerigk M, Knoth M, Müller-Hannemann M, Schmidt M, Schöbel A (2011) The price of robustness in timetable information. In: Caprara A, Kontogiannis S (eds) Proceedings of ATMOS, OASIcs, vol 20. Schloss Dagstuhl–Leibniz-Zentrum für Informatik, Dagstuhl, Germany, pp 76–87 Google Scholar
  19. Goverde R (1998) The max-plus algebra approach to railway timetable design. In: Computers in railways VI: proceedings of the 6th international conference on computer aided design, manufacture and operations in the railway and other advanced mass transit systems, Lisbon, pp 339–350 Google Scholar
  20. Goverde RM (2007) Railway timetable stability analysis using max-plus system theory. Transp Res, Part B, Methodol 41(2):179–201 CrossRefGoogle Scholar
  21. Heidergott B, de Vries R (2001) Towards a control theory for transportation networks. Discrete Event Dyn Syst 11:371–398 CrossRefGoogle Scholar
  22. Heilporn G, Giovanni LD, Labbé M (2008) Optimization models for the single delay management problem in public transportation. Eur J Oper Res 189(3):762–774 CrossRefGoogle Scholar
  23. Kliewer N, Suhl L (2011) A note on the online nature of the railway delay management problem. Networks 57 Google Scholar
  24. Krumke SO, Thielen C, Zeck C (2011) Extensions to online delay management on a single train line: new bounds for delay minimization and profit maximization. Math Methods Oper Res 74(1):53–75 CrossRefGoogle Scholar
  25. Liebchen C, Lübbecke M, Möhring RH, Stiller S (2009) The concept of recoverable robustness, linear programming recovery, and railway applications. In: Ahuja RK, Möhring R, Zaroliagis C (eds) Robust and online large-scale optimization. Lecture notes in computer science, vol 5868. Springer, Heidelberg, pp 1–27 CrossRefGoogle Scholar
  26. Lusby R, Larsen J, Ehrgott M, Ryan D (2011) Railway track allocation: models and methods. OR Spektrum 33:843–883 CrossRefGoogle Scholar
  27. Nachtigall K (1998) Periodic network optimization and fixed interval timetables. Deutsches Zentrum für Luft—und Raumfahrt. Institut für Flugführung, Braunschweig. Habilitationsschrift Google Scholar
  28. Nachtigall K, Jerosch K (2008) Simultaneous network line planning and traffic assignment. In: Fischetti M, Widmayer P (eds) Proceedings of ATMOS, OASICS, vol 9. Schloss Dagstuhl—Leibniz-Zentrum für Informatik, Germany Google Scholar
  29. Odijk MA (1996) A constraint generation algorithm for the construction of periodic railway timetables. Transp Res, Part B, Methodol 30(6):455–464 CrossRefGoogle Scholar
  30. Schachtebeck M, Schöbel A (2010) To wait or not to wait and who goes first? Delay management with priority decisions. Transp Sci 44(3):307–321 CrossRefGoogle Scholar
  31. Schmidt M (2012) Integrating routing decisions in network problems. PhD thesis, Universität Göttingen Google Scholar
  32. Schmidt M, Schöbel A (2010) The complexity of integrating routing decisions in public transportation models. In: Erlebach T, Lübbecke M (eds) Proceedings of ATMOS, OASIcs, vol 14. Schloss Dagstuhl–Leibniz-Zentrum für Informatik, Dagstuhl, Germany, pp 156–169 Google Scholar
  33. Schöbel A (2001) A model for the delay management problem based on mixed-integer programming. Electron Notes Theor Comput Sci 50(1) Google Scholar
  34. Schöbel A (2006) Optimization in public transportation. Stop location, delay management and tariff planning from a customer-oriented point of view. Optimization and its applications. Springer, New York Google Scholar
  35. Schöbel A (2007) Integer programming approaches for solving the delay management problem. In: Algorithmic methods for railway optimization. Lecture notes in computer science, vol 4359. Springer, Berlin, pp 145–170 CrossRefGoogle Scholar
  36. Schöbel A, Kratz A (2009) A bicriteria approach for robust timetabling? Lect Notes Comput Sci 5868:119–144 CrossRefGoogle Scholar
  37. Schöbel A, Scholl S (2006) Line planning with minimal travel time. In: 5th workshop on algorithmic methods and models for optimization of railways, no. 06901 in dagstuhl seminar proceedings Google Scholar
  38. Serafini P, Ukovich W (1989) A mathematical model for periodic scheduling problems. SIAM J Discrete Math 2:550–581 CrossRefGoogle Scholar
  39. Suhl L, Mellouli T (1999) Requirements for, and design of, an operations control system for railways. In: Computer-aided transit scheduling. Springer, Berlin Google Scholar
  40. Suhl L, Biederbick C, Kliewer N (2001a) Design of customer-oriented dispatching support for railways. In: VoßS, Daduna JR (eds) Computer-aided scheduling of public transport. Lecture notes in economics and mathematical systems, vol 505. Springer, Berlin, pp 365–386 CrossRefGoogle Scholar
  41. Suhl L, Mellouli T, Biederbick C, Goecke J (2001b) Managing and preventing delays in railway traffic by simulation and optimization. In: Mathematical methods on optimization in transportation systems, pp 3–16 Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2013

Authors and Affiliations

  1. 1.Institute for Numerical and Applied MathematicsUniversity of GöttingenGöttingenGermany

Personalised recommendations