Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs

  • Harun Öztürk
Original Paper
  • 19 Downloads

Abstract

In real-life manufacturing systems, the presence of defective products in a lot is inevitable. While these products may be just scrapped in the food industry, in high-tech industries where the final product is very expensive, they may be reworked at a cost. A common assumption in the literature is that the inspection time needed to identify defective items is completed when the production process ends. However, the assumption of continuous inspection during production complicates the analysis, making it impractical for most production systems, especially when the production rate is high, and the proportion of defective items is low, making continuous inspection during production very expensive. In addition, such factors as process deterioration or other uncontrollable factors in the production process may interrupt the production of the lot. To address these practical issues, this paper integrates inspection time and the failure of production facilities into an imperfect production inventory model with rework, where the production run time is a decision variable and an inspection process continues even after a production run; the paper demonstrates significant effects on the optimal solutions, with shortages not allowed. Under these assumptions, a mathematical model is derived, and the concavity of the expected total profit function is proved. Optimal policy is obtained by applying the analytic method. Special cases of the model are studied and a numerical example with sensitivity analysis is provided to draw insights. Moreover, this numerical example is used to compare general and special cases.

Keywords

Inventory Production run time Scrap Rework Random breakdowns Inspection costs 

Notes

Acknowledgements

The author expresses sincere appreciation to the editor and anonymous reviewers for their efforts to improve the quality of this paper.

References

  1. Abboud NE (1997) A simple approximation of the EMQ model with Poisson machine failures. Prod Plan Control 8(4):385–397CrossRefGoogle Scholar
  2. Abboud NE (2001) A discrete-time Markov production–inventory model with machine breakdowns. Comput Ind Eng 39:95–107CrossRefGoogle Scholar
  3. Berg M, Posner MJM, Zhao H (1994) Production–inventory systems with unreliable machines. Oper Res 421:111–118CrossRefGoogle Scholar
  4. Bielecki T, Kumar PR (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Oper Res 36(4):532–541CrossRefGoogle Scholar
  5. Boone T, Ganeshan R, Guo Y, Ord JK (2000) The impact of imperfect processes on production run times. Decis Sci 31(4):773–787CrossRefGoogle Scholar
  6. Cárdenas-Barrón LE (2009) Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 57(3):1105–1113CrossRefGoogle Scholar
  7. Chakraborty T, Giri BC (2014) Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks. Oper Res Int J 14(1):29–50CrossRefGoogle Scholar
  8. Chakraborty T, Giri BC, Chaudhari KS (2008) Production lot sizing with process deterioration and machine breakdown. Eur J Oper Res 185(2):606–618CrossRefGoogle Scholar
  9. Chan WM, Ibrahim RN, Lochert PB (2003) A new EPQ model: integrating lower pricing, rework and reject situations. Prod Plan Control 14(7):588–595CrossRefGoogle Scholar
  10. Chiu YP (2003) Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng Optim 35(4):427–437CrossRefGoogle Scholar
  11. Chiu SW, Wang SL, Chiu YSP (2007) Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur J Oper Res 180:664–676CrossRefGoogle Scholar
  12. Chiu YSP, Lin HD, Chang HH (2011) Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Comput Ind Eng 60(4):576–584CrossRefGoogle Scholar
  13. Chiu SW, Chou CL, Wu WK (2013) Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown. Econ Model 35:330–337CrossRefGoogle Scholar
  14. Chiu SW, Lin HD, Song MS, Chen HM, Chiu YSP (2015) An extended EPQ-based problem with a discontinuous delivery policy, scrap rate, and random breakdown. Sci World J.  https://doi.org/10.1155/2015/621978 CrossRefGoogle Scholar
  15. Chung KJ (1997) Bounds for production lot sizing with machine breakdowns. Comput Ind Eng 32(1):139–144CrossRefGoogle Scholar
  16. Chung KJ (2003) Approximations to production lot sizing with machine breakdowns. Comput Oper Res 30(10):1499–1507CrossRefGoogle Scholar
  17. Chung KJ, Hou KL (2003) An optimal production run time with imperfect production processes and allowable shortages. Comput Oper Res 30(4):483–490CrossRefGoogle Scholar
  18. Flapper SDP, Teunter RH (2004) Logistic planning of rework with deteriorating work-in-process. Int J Prod Econ 88:51–59CrossRefGoogle Scholar
  19. Flapper SDP, Fransoo JC, Broekmeulen RACM, Inderfurth K (2002) Planning and control of rework in the process industries: a review. Prod Plan Control 13(1):26–34CrossRefGoogle Scholar
  20. Giri BC, Dohi T (2006) Optimal inspection schedule in an imperfect EMQ model with free repair warranty policy. J Oper Res Soc Jpn 49(3):222–237CrossRefGoogle Scholar
  21. Glock CH (2013) The machine breakdown paradox: how random shifts in the production rate may increase company profits. Comput Ind Eng 66:1171–1176CrossRefGoogle Scholar
  22. Glock CH, Jaber MY (2013a) An economic production quantity (EPQ) model for a customer-dominated supply chain with defective items, reworking and scrap. Int J Serv Oper Manag 14:236–251Google Scholar
  23. Glock CH, Jaber MY (2013b) A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Comput Ind Eng 64:708–720CrossRefGoogle Scholar
  24. Groenevelt H, Pintelon L, Seidmann A (1992) Production lot sizing with machine breakdowns. Manag Sci 38(1):104–123CrossRefGoogle Scholar
  25. Gupta T, Chakraborty S (1984) Looping in a multistage production system. Int J Prod Res 22(2):299–311CrossRefGoogle Scholar
  26. Hayek PA, Salameh MK (2001) Production lot sizing with the reworking of imperfect quality items produced. Prod Plan Control 12(6):584–590CrossRefGoogle Scholar
  27. Hsu JT, Hsu LF (2013) Two EPQ models with imperfect production process, inspection errors, planned backorders, and sales returns. Comput Ind Eng 64(1):389–402CrossRefGoogle Scholar
  28. Hsu LF, Hsu JT (2015) Economic production quantity (EPQ) models under an imperfect production process with shortages backordered. Int J Syst Sci 47(4):852–867CrossRefGoogle Scholar
  29. Huang H, He Y, Li D (2017) EPQ for an unreliable production system with endogenous reliability and product deterioration. Int Trans Oper Res 24:839–866CrossRefGoogle Scholar
  30. Inderfurth K, Janiak A, Kovalyov MY, Werner F (2006) Batching work and rework processes with limited deterioration of reworkables. Comput Oper Res 33:1595–1605CrossRefGoogle Scholar
  31. Jamal AMM, Sarker BR, Mondal S (2004) Optimal manufacturing batch size with rework process at a single-stage production system. Comput Ind Eng 47(1):77–89CrossRefGoogle Scholar
  32. Khan M, Jaber MY, Guiffrida AL, Zolfaghari S (2011) A review of the extensions of a modified EOQ model for imperfect quality items. Int J Prod Econ 132:1–12CrossRefGoogle Scholar
  33. Kontantaras I, Goyal SK, Papachristos S (2007) Economic ordering policy for an item with imperfect quality subject to the in-house inspection. Int J Syst Sci 38(6):473–482CrossRefGoogle Scholar
  34. Lee HL, Rosenblatt MJ (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Manag Sci 33(9):1125–1136CrossRefGoogle Scholar
  35. Li N, Chan FTS, Chung SH, Tai AH (2015) An EPQ model for deteriorating production system and items with rework. Math Probl Eng.  https://doi.org/10.1155/2015/957970 CrossRefGoogle Scholar
  36. Liao GL (2016) Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance. Int J Prod Res 54(20):6265–6280CrossRefGoogle Scholar
  37. Lin GC, Gong DC (2006) On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time. Math Comput Model 43(7–8):920–932CrossRefGoogle Scholar
  38. Lin GC, Kroll DE (2006) Economic lot sizing for an imperfect production system subject to random breakdowns. Eng Optim 38(1):73–92CrossRefGoogle Scholar
  39. Lin GC, Lin HD (2007) Determining a production run time for an imperfect production–inventory system with scrap. J Sci Ind Res 66:724–735Google Scholar
  40. Liu B, Cao J (1999) Analysis of a production–inventory system with machine breakdowns and shutdowns. Comput Oper Res 20(1):73–91CrossRefGoogle Scholar
  41. Liu JJ, Yang P (1996) Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. Eur J Oper Res 91:517–527CrossRefGoogle Scholar
  42. Liu N, Kim Y, Hwang H (2009) An optimal operating policy for the production system with rework. Comput Ind Eng 56:874–887CrossRefGoogle Scholar
  43. Ma WN, Gong DC, Lin GC (2010) An optimal common production cycle time for imperfect production processes with scrap. Math Comput Model 52:724–737CrossRefGoogle Scholar
  44. Maddah B, Salameh MK, Karame GM (2009) Lot sizing with random yield and different qualities. Appl Math Model 33(4):1997–2009CrossRefGoogle Scholar
  45. Moinzadeh K, Aggarwal P (1997) Analysis of a production/inventory system subject to random disruptions. Manag Sci 43(11):1577–1588CrossRefGoogle Scholar
  46. Mokhtari H (2018) A joint international production and external supplier order lot size optimization under defective manufacturing and rework. Int J Adv Manuf Technol 95(1–4):1039–1058CrossRefGoogle Scholar
  47. Moussawi-Haidar L, Salameh M, Nasr W (2016) Production lot sizing with quality screening and rework. Appl Math Model 40:3242–3256CrossRefGoogle Scholar
  48. Nobil AH, Sedigh AHA, Tiwari S, Wee HM (2018) An imperfect multi-item single machine production system with shortage, rework, and scrapped considering inspection, dissimilar deficiency levels, and non-zero setup times. Scientia Iranica.  https://doi.org/10.24200/sci.2018.4984.1031 CrossRefGoogle Scholar
  49. Öztürk H (2017) A note on “Production lot sizing with quality screening and rework”. Appl Math Model 43:659–669CrossRefGoogle Scholar
  50. Porteus EL (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 34:137–144CrossRefGoogle Scholar
  51. Rezaei J (2016) Economic order quantity and sampling inspection plans for imperfect items. Comput Ind Eng 96:1–7CrossRefGoogle Scholar
  52. Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production processes. IIE Trans 18(1):48–55CrossRefGoogle Scholar
  53. Salameh MK, Jaber MY (2000) Economic production quantity model for items with imperfect quality. Int J Prod Econ 64:59–64CrossRefGoogle Scholar
  54. Sarkar B, Cárdenas-Barrón LE, Sarkar M, Singgih ML (2014) An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J Manuf Syst 33(3):423–435CrossRefGoogle Scholar
  55. Sharafali M (1984) On a continuous review production–inventory problem. Oper Res Lett 3(4):199–204CrossRefGoogle Scholar
  56. Shih W (1980) Optimal inventory policies when stockouts result from defective products. Int J Prod Res 18(6):677–686CrossRefGoogle Scholar
  57. Suntag C (1993) Inspection and inspection quality management. ASQC, MilwaukeeGoogle Scholar
  58. Tai AH (2013) Economic production quantity models for deteriorating/imperfect products and service with rework. Comput Ind Eng 66:879–888CrossRefGoogle Scholar
  59. Taleizadeh AA, Cárdenas-Barrón LE, Mohammadi B (2014) A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing. Int J Prod Econ 150:9–27CrossRefGoogle Scholar
  60. Taleizadeh AA, Sari-Khanbaglo MP, Cárdenas-Barrón LE (2017) Outsourcing rework of imperfect items in the economic production quantity (EPQ) inventory model with backordered demand. IEEE Trans Syst Man Cybern Syst.  https://doi.org/10.1109/tsmc.2017.2778943 CrossRefGoogle Scholar
  61. Ting CK, Chiu YSP, Chan CCH (2011) Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period. Math Comput Appl 16(2):329–339Google Scholar
  62. Tsao YC, Chen TH, Huang SM (2011) A production policy considering reworking of imperfect items and trade credit. Flex Serv Manuf J 23:48–63CrossRefGoogle Scholar
  63. Wazwaz AM (2011) Linear and nonlinear integral equations. Springer, BeijingCrossRefGoogle Scholar
  64. Wee HM, Widyadana GA (2013) A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega 41(6):941–954CrossRefGoogle Scholar
  65. Wee HM, Wang WT, Cárdenas-Barrón LE (2013) An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 64(2):748–755CrossRefGoogle Scholar
  66. Wee HM, Wang WT, Kuo TC, Cheng YL, Huang YD (2014) An economic production quantity model with non-synchronized screening and rework. Appl Math Comput 233:127–138Google Scholar
  67. Widyadana GA, Wee HM (2011) Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. Appl Math Model 35:3495–3508CrossRefGoogle Scholar
  68. Widyadana GA, Wee HM (2012) An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown. Int J Syst Sci 43(10):1870–1882CrossRefGoogle Scholar
  69. Yoo SH, Kim DS, Park MS (2009) Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. Int J Prod Econ 121(1):255–265CrossRefGoogle Scholar
  70. Zhang X, Gerchak Y (1990) Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Trans 22(1):41–47CrossRefGoogle Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2018

Authors and Affiliations

  1. 1.Department of Business Administration, Faculty of Economics and Administrative SciencesSuleyman Demirel UniversityÇünür, IspartaTurkey

Personalised recommendations