Analysis of steel-concrete composite structure with overlap slab of Xingguang bridge
- 149 Downloads
- 4 Citations
Abstract
Finite element modeling methods of steel-concrete composite structure with overlap slab were investigated. A two-step finite element method was presented. It was applied to analyze an extra long span composite bridge. The conversion of structure system and the mechanical behavior of the bridge were analyzed with two different construction methods. The stresses of steel beams, precast slabs and in-situ-place concrete under the total load were compared. The results show that steel-concrete composite structure with overlap slab has many advantages, the construction method that the top in-situ concrete and the concrete in construction joints are cast respectively is rather reasonable than the one that the top in-situ concrete and the concrete in construction joints are cast at the same time, and the two-step finite element method is affective to such large-scale structures.
Key words
composite structure numerical method two-step finite element method mechanical behaviorPreview
Unable to display preview. Download preview PDF.
References
- [1]LAM D, ELLIOTT K S, NETHERCOT D A. Parametric study on composite steel beams with precast concrete hollow core floor slab[J]. Journal of Constructional Steel Research, 2000, 54(2): 283–304.CrossRefGoogle Scholar
- [2]LÄÄNE A, LEBET J P. Available rotation capacity of composite bridge plate girders under negative moment and shear [J]. Journal of Constructional Steel Research, 2005, 61(3): 305–327.CrossRefGoogle Scholar
- [3]YE Mei-xin, HUANG Qiong. Study of steel structure accidents[J]. Journal of the Changsha Railway University, 2002, 20(4): 6–10. (in Chinese)MathSciNetGoogle Scholar
- [4]NAKAMURA S, MOMIYAMA Y, HOSAKA T, et al. New technologies of steel/concrete composite bridges[J]. Journal of Constructional Steel Research, 2002, 58(1): 99–130.CrossRefGoogle Scholar
- [5]YE Mei-xin, HUANG Qiong. Damage detection of high-speed railway steel-concrete composite beam[J]. Journal of Central South University: Science and Technology, 2005, 36(4): 704–709.(in Chinese)Google Scholar
- [6]Brozzetti J. Design development of steel-concrete composite bridges in France[J]. Journal of Constructional Steel Research, 2000, 55(1/3): 229–243.CrossRefGoogle Scholar
- [7]HAENSEL J. Composite bridge design: The reanimation of steel bridge construction[J]. Journal of Constructional Steel Research, 1998, 46(1/3): 54–55.CrossRefGoogle Scholar
- [8]SHIM C S, LEE P G, CHANG S P. Design of shear connection in composite steel and concrete bridges with precast decks[J]. Journal of Constructional Steel Research, 2001, 57(3): 203–219.CrossRefGoogle Scholar
- [9]YE Mei-xin, ZHANG Ye-zhi. Behavior of steel-concrete composite beams under the action of negative moment[J]. China Railway Science, 2001, 22(5): 41–47.(in Chinese)Google Scholar
- [10]MARÍ A, MIRAMBELL E, ESTRADA I. Effects of construction process and slab prestressing on the serviceability behaviour of composite bridges[J]. Journal of Constructional Steel Research, 2003, 59(2): 135–163.CrossRefGoogle Scholar
- [11]RYU H K, CHANG S P. Ultimate strength of continuous composite box-girder bridges with precast decks[J]. Journal of Constructional Steel Research, 2005, 61(3): 329–343.CrossRefGoogle Scholar
- [12]YE Mei-xin, ZHANG Ye-zhi. Concrete-steel truss composite girder and shear connectors[J]. Journal of the China Railway Society, 1999, 21(1): 67–71.(in Chinese)Google Scholar
- [13]LUO Ru-deng, YE Mei-xin. Study calculation of deflection of composite girders under action of negative moments[J]. China Railway Science, 2001, 22(5): 61–64. (in Chinese)Google Scholar
- [14]ZHANG Ye-zhi. Analysis on responses of continuous composite beams in high-speed railways[J]. Journal of the China Railway Society, 2002, 24(6): 84–88. (in Chinese)Google Scholar