Management of recycling operations for iron and steel making slags

  • Christoph MeyerEmail author
  • Matthias G. Wichmann
  • Thomas S. Spengler
Original Paper

Abstract

Iron and steelmaking slags constitute important by-products of iron and steel production. Since slags are indispensable to iron and steel making processes, established recycling alternatives can be used to convert accruing slags to secondary resources, such as road construction materials, cements and fertilizers. The potential of a recycling alternative depends on a multitude of technical, economic and ecological influencing factors. In short-term production planning, the concurrence of these factors leads to the question how slags are to be recycled. The focus of this contribution is set on developing an adequate recycling planning approach based on techno-economic modelling. By combining activity analysis and flowsheet simulation, a modelling methodology is derived, which allows to model mechanical recycling processes characterized by particle size distributions. Further, management accounting and price functions are used to describe the occurring recycling costs and revenues for secondary resources, which are characterized by regional market structures. The developed concept is incorporated into a decision model, which is used in an illustrative example.

Keywords

Management of recycling operations Iron and steel making slags Operative recycling planning Techno-economic modelling 

JEL Classification

C61 M11 Q53 

References

  1. Arlt KJ, Joost M (2012) Neue Aufbereitungstechnologie von Stahlwerksschlacken bei der AG der Dillinger Hüttenwerke. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 2. TK, Neuruppin, pp 129–138Google Scholar
  2. Aspen Technology (2012) Transformation of process engineering—innovations and best practices. https://www.aspentech.com/Transformation_of_Process_Engineering.pdf. Accessed 5 Jan 2016
  3. Aspen Technology (2013) Overview of solids modeling for chemical processes. http://www.aspentech.com/Solids_Modeling_Chemical_Processes.pdf. Accessed 5 Jan 2016
  4. Babu BV (2004) Process plant simulation. Oxford University Press, OxfordGoogle Scholar
  5. Barros AI, Dekker R, Scholten V (1998) A two-level network for recycling sand: a case study. Eur J Oper Res 110:199–214CrossRefGoogle Scholar
  6. Bertram HU (2015) Anmerkungen zur Ersatzbaustoffverordnung. In: Thomé-Kozmiensky KJ (ed) Mineralische Nebenprodukte und Abfälle 2. TK, Neuruppin, pp 23–53Google Scholar
  7. Brink HJ (1969) Zur Planung des optimalen Fertigungsprogramms. Heymann, KölnGoogle Scholar
  8. Bührens J (1979) Programmplanung bei Kuppelproduktion. In: Jacob H (ed) Betriebswirtschaftliche Forschung zur Unternehmensführung 11. Gabler, WiesbadenGoogle Scholar
  9. Das B, Prakash S, Reddy PSR, Misra VN (2007) An overview of utilization of slag and sludge from steel industries. Resour Conserv Recycl 50:40–57CrossRefGoogle Scholar
  10. Diener A, Kieckhäfer K, Spengler TS (2013) A material flow-based approach for the economic assessment of alternative landfill mining concepts. In: Geldermann J, Schumann M (eds) First international conference on resource efficiency in interorganizational networks. Universitätsverlag Göttingen, Göttingen, pp 362–373Google Scholar
  11. DIN 4301 (2009) Eisenhüttenschlacke und Metallhüttenschlacke im BauwesenGoogle Scholar
  12. Directive 2008/98/EC (2008) Waste Framework DirectiveGoogle Scholar
  13. Domschke W, Klein R (2000) Produktionsprogrammplanung bei nichtlinearen Deckungsbeitragsfunktionen. WISU 29(12):1649–1655Google Scholar
  14. Drissen P (2014) Stahlwerksschlacken als Düngemittel in der Landwirtschaft. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 3. TK, Neuruppin, pp 167–176Google Scholar
  15. Durinck D, Engström F, Arnout S, Heulens J, Jones PT, Björkman B, Blanpain B, Wollants P (2008) Hot stage processing of metallurgical slags. Resour Conserv Recycl 52:1121–1131CrossRefGoogle Scholar
  16. Dutta G, Fourer R (2001) A survey of mathematical programming applications in integrated steel plants. Manuf Serv Oper Manag 3(4):387–400Google Scholar
  17. Dyckhoff H, Spengler TS (2010) Produktionswirtschaft, 3rd edn. Springer, BerlinCrossRefGoogle Scholar
  18. Endemann G (2014) KrWG, AwSV und MantelV. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 3. TK, Neuruppin, pp 37–50Google Scholar
  19. Fandel G (2007) Produktion 1, 7th edn. Springer, BerlinGoogle Scholar
  20. FEhS (2010) Regelwerke, in denen Eisenhüttenschlacken explizit genannt sind. www.fehs.de/uploads/media/Normenliste_EHS_Deutschland.pdf. Accessed 5 Jan 2016
  21. Fischer R (2015) Anmerkungen zur Mantelverordnung aus Sicht der Wirtschaft. In: Thomé-Kozmiensky KJ (ed) Mineralische Nebenprodukte und Abfälle 2. TK, Neuruppin, pp 3–22Google Scholar
  22. French ML, LaForge RL (2006) Closed-loop supply chains in process industries. J Oper Manag 24(3):271–286CrossRefGoogle Scholar
  23. Fröhling M (2006) Zur taktisch-operativen Planung stoffstrombasierter Produktionssysteme. DUV, WiesbadenGoogle Scholar
  24. Fröhling M, Rentz O (2010) A case study on raw material blending for the recycling of ferrous wastes in a blast furnace. J Clean Prod 18(2):161–173CrossRefGoogle Scholar
  25. Fröhling M, Schwaderer F, Bartusch H, Rentz O (2010) Integrated planning of transportation and recycling for multiple plants based on process simulation. Eur J Oper Res 207(2):958–970CrossRefGoogle Scholar
  26. Geiseler J (2000) Slag—Approved materials for a better future. In: FEhS (ed) Schriftenreihe der Forschungsgemeinschaft Eisenhüttenschlacken 8—Iron and steel slags—Properties and utilization. FEhS, Duisburg, pp 9–23Google Scholar
  27. Grömling M (2011) Volkswirtschaftliches Porträt der deutschen Baustoffindustrie. http://www.bvbaustoffe.de/root/img/pool/downloads_2011/branchenportrait_2011.pdf. Accessed 5 Jan 2016
  28. Guldan D (2013) Aufbereitung von Edelstahlschlacken. In: Thomé-Kozmiensky KJ (ed) Aschen–Schlacken–Stäube. TK, Neuruppin, pp 565–586Google Scholar
  29. Hähre S (2000) Stoffstrommanagement in der Metallindustrie. In: VDI (ed) Fortschritt-Berichte VDI 16(115). VDI, DüsseldorfGoogle Scholar
  30. Hildenbrand K, Hildenbrand W (1975) Lineare ökonomische Modelle. Springer, BerlinCrossRefGoogle Scholar
  31. Höffl K (1986) Zerkleinerungs- und Klassiermaschinen. Springer, BerlinCrossRefGoogle Scholar
  32. Hoyer C, Kieckhäfer K, Spengler TS (2015) Technology and capacity planning for the recycling of lithium-ion electric vehicle batteries in Germany. J Bus Econ 85:505–544CrossRefGoogle Scholar
  33. Hummeltenberg W (1983) Die Berechnung von Standortmodellen mit der heutigen MPS-Software. ZfbF 1983(6):461–477Google Scholar
  34. Jacob H (1963) Preispolitik. In: Gutenberg E (ed) Die Wirtschaftswissenschaften 17. Gabler, WiesbadenGoogle Scholar
  35. Johnson LA, Montgomery DC (1974) Operations research in production planning, scheduling, and inventory control. Wiley, New YorkGoogle Scholar
  36. Kallrath J (2002) Planning and scheduling in the process industry. OR Spectr 2002(24):219–250CrossRefGoogle Scholar
  37. Klingelhöfer HE (1999) Betriebliche Entsorgung und Produktion. DUV, WiesbadenGoogle Scholar
  38. Knappe F, Dehoust G, Petschow U, Jakubowski G (2012) Steigerung von Akzeptanz und Einsatz mineralischer Sekundärrohstoffe unter Berücksichtigung schutzgutbezogener und anwendungsbezogener Anforderungen, des potenziellen, volkswirtschaftlichen Nutzens sowie branchenbezogener, ökonomischer Anreizinstrumente. Umweltbundesamt-Texte 2012(28)Google Scholar
  39. Koopmans TC (1951) Analysis of production as an efficient combination of activities. In: Koopmans TC (ed) Activity analysis of production and allocation. Wiley, Chapman & Hall, London, New York, pp 33–97Google Scholar
  40. KrWG (2012) Gesetz zur Förderung der Kreislaufwirtschaft und Sicherung der umweltverträglichen Bewirtschaftung von Abfällen (Kreislaufwirtschaftsgesetz—KrWG)Google Scholar
  41. LAGA (2003) Mitteilungen der Länderarbeitsgemeinschaft (LAGA) 20—Anforderungen an die stoffliche Verwertung von mineralischen Reststoffen/Abfällen—Technische RegelnGoogle Scholar
  42. Mahieux PY, Aubert JE, Escadeillas G (2009) Utilization of weathered basic oxygen furnace slag in the production of hydraulic road binders. Constr Build Mater 23(2):742–747CrossRefGoogle Scholar
  43. MantelV-E (2012) Verordnung zur Festlegung von Anforderungen für das Einbringen und das Einleiten von Stoffen in das Grundwasser, an den Einbau von Ersatzbaustoffen und für die Verwendung von Boden und bodenähnlichem Material—EntwurfGoogle Scholar
  44. Merkel T (2015) Eisenhüttenschlacken im Jahr 2014—Erhebungen zu Produktion und Nutzung. Report des FEhS-Instituts 22(1):24Google Scholar
  45. Meyer C, Wichmann MG, Spengler TS (2013) Techno-economic analysis and evaluation of recycling measures for iron and steel slags. In: Geldermann J, Schumann M (eds) First international conference on resource efficiency in interorganizational networks. Universitätsverlag Göttingen, Göttingen, pp 321–333Google Scholar
  46. Meyer C, Wichmann MG, Spengler TS (2014a) Recycling von Eisenhüttenschlacken. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 3. TK, Neuruppin, pp 231–250Google Scholar
  47. Meyer C, Wichmann MG, Spengler TS (2014b) Modellbasierte Recyclingplanung für Eisenhüttenschlacken. OR News 2014(52):6–10Google Scholar
  48. Miron JA (1996) The economics of seasonal cycles. MIT Press, CambridgeGoogle Scholar
  49. Motz H, Geiseler J (2001) Products of steel slags an opportunity to save natural resources. Waste Manag 21(3):285–293CrossRefGoogle Scholar
  50. Nicolai M (1994) Zur Konfiguration von verfahrenstechnischen Anlagen für das wirtschaftliche Recycling von Bauschutt. Dissertation, Universität KarlsruheGoogle Scholar
  51. Papageorgiou LG (2009) Supply chain optimisation for the process industries. Comput Chem Eng 33(12):1931–1938CrossRefGoogle Scholar
  52. Pettersson F, Saxén H (2006) Model for economic optimization of iron production in the blast furnace. ISIJ Int 46(9):1297–1305CrossRefGoogle Scholar
  53. Rao SR (2006) Resource recovery and recycling from metallurgical wastes. Elsevier, AmsterdamGoogle Scholar
  54. Rentz O, Fröhling M, Nebel F, Schultmann F, Engels B (2006) Integrierter Umweltschutz in der Metallerzeugung. Universitätsverlag Karlsruhe, KarlsruheGoogle Scholar
  55. Rex M, Drissen P, Bartsch S, Breuer J, Pischke J (2014) Pflanzenverfügbarkeit von Phosphaten aus Klärschlamm- und Tiermehlaschen nach Aufschluss in flüssiger Konverterschlacke. In: VDLUFA (ed) VDLUFA-Schriftenreihe 69, VDLUFA, Darmstadt, pp 244–253Google Scholar
  56. Rychel R (2001) Modellierung des Betriebsverhaltens von Rotorschleuderbrechern. Dissertation, Technische Universität Bergakademie FreibergGoogle Scholar
  57. Schubert H (1989) Aufbereitung fester mineralischer Rohstoffe, 4th edn. VEB, LeipzigGoogle Scholar
  58. Schubert H (2002) Handbuch der mechanischen Verfahrenstechnik. Wiley-VCH, WeinheimCrossRefGoogle Scholar
  59. Schüler S, Algermissen D, Markus HP, Mudersbach D (2014) Einfluss der Metallurgie auf die Umweltverträglichkeit von Elektroofenschlacke. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 3. TK, Neuruppin, pp 109–125Google Scholar
  60. Schultmann F (2003) Stoffstrombasiertes Produktionsmanagement. ESV, BerlinGoogle Scholar
  61. Schwister K, Leven V (2014) Verfahrenstechnik für Ingenieure, 2nd edn. Carl Hanser, MünchenCrossRefGoogle Scholar
  62. Sieverdingbeck A (2001) Zur Planung einer emissionsarmen Produktion in der Eisen- und Stahlindustrie. In: VDI (ed) Fortschritt-Berichte VDI 16(128). VDI, DüsseldorfGoogle Scholar
  63. Smolczyk HG (2000) Slag structure and identification of slags. In: FEhS (ed) Schriftenreihe der Forschungsgemeinschaft Eisenhüttenschlacken 8—Iron and steel slags—Properties and utilization. FEhS, Duisburg, pp 41–70Google Scholar
  64. Spengler TS (1994) Industrielle Demontage- und Recyclingkonzepte. ESV, BerlinGoogle Scholar
  65. Spengler TS (1998) Industrielles Stoffstrommanagement. ESV, BerlinGoogle Scholar
  66. Spengler TS, Hähre S, Sieverdingbeck A (1998) Rentz O (1998) Stoffflußbasierte Umweltkostenrechnung zur Bewertung industrieller Kreislaufwirtschaftskonzepte. Zeitschrift für Betriebswirtschaft 68(2):147–174Google Scholar
  67. TL Gestein-StB (2007) Technische Lieferbedingungen für Gesteinskörnungen im StraßenbauGoogle Scholar
  68. TL SoB-StB (2007) Technische Lieferbedingungen für Baustoffgemische und Böden zur Herstellung von Schichten ohne Bindemittel im StraßenbauGoogle Scholar
  69. Valdivia Mercado S (1995) Ökonomische Substitutionspotentiale für natürliche Rohstoffe durch Sekundärstoffe. Peter Lang, Frankfurt am MainGoogle Scholar
  70. Versteyl LA, Jacobj H (2005) Gutachten über den rechtlichen Status von Schlacken aus der Eisen- und Stahlherstellung. In: FEhS (ed) Schriftenreihe der Forschungsgemeinschaft Eisenhüttenschlacken 12. FEhS, DuisburgGoogle Scholar
  71. Williams HP (2013) Model building in mathematical programming, 5th edn. Wiley, ChichesterGoogle Scholar
  72. Wirtschaftsvereinigung Stahl (2015) Fakten zur Stahlindustrie in Deutschland. http://www.stahl-online.de/wp-content/uploads/2013/12/201505_Fakten_Stahlindustrie_Deutschland_2015.pdf. Accessed 5 Jan 2016
  73. Wotruba H, Weitkämper L (2014) Aufbereitung metallurgischer Schlacken. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 3. TK, Neuruppin, pp 251–261Google Scholar
  74. Wulfert H, Jungmann A (2014) Herstellung hochwertiger Baustoffe aus Stahlwerksschlacken nach nahezu vollständiger Metallrückgewinnung. In: Heußen M, Motz H (eds) Schlacken aus der Metallurgie 3. TK, Neuruppin, pp 263–275Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2016

Authors and Affiliations

  • Christoph Meyer
    • 1
    Email author
  • Matthias G. Wichmann
    • 1
  • Thomas S. Spengler
    • 1
  1. 1.Institute of Automotive Management and Industrial ProductionTechnische Universität BraunschweigBraunschweigGermany

Personalised recommendations