Advertisement

Correction to: Potential revenue and breakeven of energy storage systems in PJM energy markets

  • Maurício B. C. SallesEmail author
  • Taina N. Gadotti
  • Michael J. Aziz
  • William W. Hogan
Correction
  • 114 Downloads

Correction to: Environmental Science and Pollution Research

  https://doi.org/10.1007/s11356-018-3395-y

The original publication of this paper contains a mistake.

Correct images for Figures 11, 12 and 13 are shown in this paper.
Fig. 11

Distribution of breakeven overnight installed cost for the average revenue vs. energy capacity (1 MW, 1–14MWh) of the selected nodes in the PJM RT-Market using DAM as a forecast. Assumed round trip efficiency is 70% and project lifetime is 20 years for 1 MWof rated power

Fig. 12

Distribution of breakeven overnight installed cost for the group of high potential revenue nodes in the PJM RT-Market using the DAM settlement prices as forecast, for a 1 MWof rated power ESS vs. energy capacity (1–14 MWh) for each year between 2008 and 2014. Assumed round trip efficiency is 70% and project lifetime is 20 years

Fig. 13

Distribution of breakeven overnight installed cost for the group of intermediate potential revenue nodes in the PJM RTMarket using theDAMsettlement prices as forecast, for a 1 MWof rated power ESS vs. energy capacity (1–14 MWh) for each year between 2008 and 2014. Assumed round trip efficiency is 70% and project lifetime is 20 years

The original article has been corrected.

Notes

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Laboratory of Advanced Electric Grids - LGrid, Polytechnic SchoolUniversity of São Paulo – USPSão PauloBrazil
  2. 2.John A. Paulson School of Engineering and Applied SciencesHarvard UniversityCambridgeUSA
  3. 3.John F. Kennedy School of GovernmentHarvard UniversityCambridgeUSA

Personalised recommendations