Springer Nature is making SARS-CoV-2 and COVID-19 research free. View research | View latest news | Sign up for updates

Optimal Design of Seasonal Flood Limited Water Levels by Jointing Operation of the Reservoir and Floodplains

  • 523 Accesses

  • 9 Citations

Abstract

Reservoirs play an important role in the exploitation and utilization of water resources, and the flood limited water level (FLWL) is a key parameter to balance flood control and conservation in reservoir operation. This study is aimed at joint operation of the reservoir and floodplains to improve floodwater utilization and enhance economic benefits. The net profits, namely the benefits from power generation and water supply minus the losses from the flood volume diverted to floodplains, are set as the objective function. To maximize the net profits, an optimization model is then proposed. Finally, a nonlinear optimization technique, the complex method, is used to find the optimal seasonal FLWL. The China’s Danjiangkou Reservoir (DR) is selected as a case study. The results show that the joint use of floodplains enables 2.0 m and 0.5 m increment of FLWLs in summer and autumn, respectively, compared to the conventional FLWLs. Since the increment of the FLWL decreases the reservoir flood storage by 0.44 billion m3, the flood volume need to be diverted to floodplains is increased by 0.54 billion m3 per year. Meanwhile, the power generation and water diversion are increased by 0.59% and 2.99%, respectively. The assurance probabilities of power generation, water diversion and minimum flow are also increased by 1.1%, 0.96% and 0.70%, respectively. As a result, the economic benefits can be increased by 0.037 billion USD per year. It is concluded that the reservoir seasonal FLWL can be improved by joint operation of reservoirs and floodplains, which is able to enhance economic benefits without increasing flood risks. Moreover, the increment of economic benefits could be shared by reservoir managers and residents that live in floodplains. This novel operating approach is helpful to the integrated water resources management.

This is a preview of subscription content, log in to check access.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10

References

  1. Aparicio J, Martinez-Austria PF, Guitron A, Ramirez AI (2009) Floods in tabasco, Mexico: a diagnosis and proposal for courses of action. J Flood Risk Manage 2(2):132–138

  2. Chang F-J, Chen L, Chang L-C (2005) Optimizing the reservoir operating rule curves by genetic algorithms. Hydrol Process 19(11):2277–2289

  3. Chang J, Guo A, Du H, Wang Y (2017) Floodwater utilization for cascade reservoirs based on dynamic control of seasonal flood control limit levels. Environ Earth Sci 76(6)

  4. Chen L, Guo S, Yan B, Liu P, Fang B (2010) A new seasonal design flood method based on bivariate joint distribution of flood magnitude and date of occurrence. Hydrol Sci J 55(8):1264–1280

  5. Chen J, Guo S, Li Y, Liu P, Zhou Y (2013) Joint operation and dynamic control of flood limiting water levels for cascade rservoirs. Water Resour Manag 27(3):749–763

  6. Cheng X (2005) Changes of flood control situations and adjustments of flood management strategies in China. Water Int 30(1):108–113

  7. Correia FN, Saraiva MDG, Silva FND, Ramos I (1999) Floodplain management in urban developing areas. Part I. Urban growth scenarios and land-use controls. Water Resour Manag 13:1–21

  8. De Martino G, De Paola F, Fontana N, Marini G, Ranucci A (2012) Experimental assessment of level pool routing in preliminary design of floodplain storage. Sci Total Environ 416:142–147

  9. Deng C, Liu P, Liu Y, Wu Z, Wang D (2015) Integrated hydrologic and reservoir routing model for real-time water level forecasts. J Hydrol Eng 20(9):05014032

  10. Fayaed SS, El-Shafie A, Jaafar O (2013) Reservoir-system simulation and optimization techniques. Stoch Env Res Risk A 27(7):1751–1772

  11. Gu JJ, Guo P, Huang GH, Shen N (2012) Optimization of the industrial structure facing sustainable development in resource-based city subjected to water resources under uncertainty. Stoch Env Res Risk A 27(3):659–673

  12. Guo S, Chen J, Li Y, Liu P, Li T (2011) Joint operation of the multi-reservoir system of the three gorges and the Qingjiang cascade reservoirs. Energies 4(12):1036–1050

  13. Hossain MS, El-shafie A (2013) Intelligent Systems in Optimizing Reservoir Operation Policy: a review. Water Resour Manag 27(9):3387–3407

  14. Huang Y, Mccoll WF (2002) An improved simplex method for function minimization. IEEE International Conference on Systems 3(2):1702–1705

  15. Karamouz M, Abesi O, Moridi A, Ahmadi A (2008) Development of optimization schemes for floodplain management; a case study. Water Resour Manag 23(9):1743–1761

  16. Li L, Xu H, Chen X, Simonovic SP (2009) Streamflow forecast and reservoir operation performance assessment under climate change. Water Resour Manag 24(1):83–104

  17. Li X, Guo S, Liu P, Chen G (2010) Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty. J Hydrol 391(1–2):124–132

  18. Li W, Qin Y, Sun Y, Huang H, Ling F, Tian L, Ding Y (2015) Estimating the relationship between dam water level and surface water area for the Danjiangkou reservoir using Landsat remote sensing images. Remote Sens Lett 7(2):121–130

  19. Lian J, Sun X, Ma C (2016) Multi-year optimal operation strategy of Danjiangkou reservoir after dam heightening for the middle route of the south-north water transfer project. Water Sci Technol Water Supply 16(4):961–970

  20. Lind RC (1967) Flood control alternative and the economic of flood protection. Water Resour Res 3(2):345–357

  21. Liu P, Guo S, Xiong L, Li W, Zhang H (2006) Deriving reservoir refill operating rules by using the proposed DPNS model. Water Resour Manag 20(3):337–357

  22. Liu P, Cai X, Guo S (2011) Deriving multiple near-optimal solutions to deterministic reservoir operation problems. Water Resour Res 47(8):W08506

  23. Liu P, Li L, Guo S, Xiong L, Zhang W, Zhang J, Xu C-Y (2015) Optimal design of seasonal flood limited water levels and its application for the three gorges reservoir. J Hydrol 527:1045–1053

  24. Lund JR (2002) Flood plain planning with risk-based. J Water Resour Plan Manag 128(3):202–207

  25. Ming B, Liu P, Bai T, Tang R, Feng M (2017) Improving optimization efficiency for reservoir operation using a search space reduction method. Water Resour Manag:1–18

  26. Nelder JA, Mead R (1965) A simplex method for function minimization. Comput J 7(4):308–313

  27. Ouyang S, Zhou J, Li C, Liao X, Wang H (2015) Optimal design for flood limit water level of cascade reservoirs. Water Resour Manag 29(2):445–457

  28. Raje D, Mujumdar PP (2010) Reservoir performance under uncertainty in hydrologic impacts of climate change. Adv Water Resour 33(3):312–326

  29. Santos QO, Novaes CG, Bezerra MA, Lemos VA, Moreno I, DGd S, Ld S (2010) Application of simplex optimization in the development of an automated online preconcentration system for manganese determination. J Braz Chem Soc 21(12):2340–2346

  30. Topa ME, Giugni M, De Paola F (2014) Off-stream floodplain storage: numerical modeling and experimental analysis. J Irrig Drain Eng 141(1):04014040

  31. Wang R, OuYang S (2016) Benefit analysis and optimal scheduling of Danjiangkou reservoir in the presence of the south-to-north water transfer project. J Yangtze River Scientific Res Inst 33(12):17–21 (in Chinese)

  32. Wang A, Shi W, Wang G (1997) The analysis on the stability of composite soil nailing support: slice method and complex method. Underground Space 17(1) (in Chinese)

  33. Wang Y, Han T, Xu Z, Bao G, Zhu T (2005) Optimization of phosphorus removal from secondary effluent using simplex method in Tianjin, China. J Hazard Mater 121(1–3):183–186

  34. Wood DW, Gooch TC, Pronovost PM, Noonan DC (1985) Development of a flood management. J Water Resour Plan Manag 111(4):417–433

  35. Yang G, Guo S, Li L, Hong X, Wang L (2015) Multi-objective operating rules for Danjiangkou reservoir under climate change. Water Resour Manag 30(3):1183–1202

  36. Yeh WWG (1985) Reservoir management and operations models: a state-of-the-art review. Water Resour Res 21(12):1797–1818

  37. Yun R, Singh VP (2008) Multiple duration limited water level and dynamic limited water level for flood control, with implications on water supply. J Hydrol 354(1–4):160–170

  38. Zhang Q, Gu X, Singh VP, Xiao M, Chen X (2015a) Evaluation of flood frequency under non-stationarity resulting from climate indices and reservoir indices in the East River basin, China. J Hydrol 527:565–575

  39. Zhang J, Liu P, Wang H, Lei X, Zhou Y (2015b) A Bayesian model averaging method for the derivation of reservoir operating rules. J Hydrol 528:276–285

  40. Zhang W, Liu P, Chen X, Wang L, Ai X, Feng M, Liu D, Liu Y (2016) Optimal operation of multi-reservoir systems considering time-lags of flood routing. Water Resour Manag 30(2):523–540

  41. Zhao T, Zhao J, Lei X, Wang X, Wu B (2017) Improved dynamic programming for reservoir flood control operation. Water Resour Manag 31(7):2047–2063

  42. Zhou Y, Guo S (2013) Incorporating ecological requirement into multipurpose reservoir operating rule curves for adaptation to climate change. J Hydrol 498:153–164

  43. Zhou Y, Guo S (2014) Risk analysis for flood control operation of seasonal flood-limited water level incorporating inflow forecasting error. Hydrol Sci J 59(5):1006–1019

  44. Zhou Y, Guo S, Liu P, Xu C (2014) Joint operation and dynamic control of flood limiting water levels for mixed cascade reservoir systems. J Hydrol 519:248–257

  45. Zhu X, Zhang C, Yin J, Zhou H (2014) Optimization of water diversion based on reservoir operating rules: analysis of the Biliu River reservoir, China. J Hydrol Eng 19(2)

Download references

Acknowledgments

This study was supported by the National Key Research and Development Program of China (2016YFC0400907), the Excellent Young Scientist Foundation of the National Natural Science Foundation of China (51422907) and the National Natural Science Foundation of China (51579180). The authors thank the editor and the anonymous reviewers for their comments, which helped improve the quality of the paper.

Author information

Correspondence to Pan Liu.

Ethics declarations

Conflict of Interest

The authors declare that they have no conflict of interest.

Rights and permissions

Reprints and Permissions

About this article

Verify currency and authenticity via CrossMark

Cite this article

Xie, A., Liu, P., Guo, S. et al. Optimal Design of Seasonal Flood Limited Water Levels by Jointing Operation of the Reservoir and Floodplains. Water Resour Manage 32, 179–193 (2018). https://doi.org/10.1007/s11269-017-1802-7

Download citation

Keywords

  • Floodwater utilization
  • Flood limited water level
  • Reservoir operation