Springer Nature is making SARS-CoV-2 and COVID-19 research free. View research | View latest news | Sign up for updates

Analysis of the Results of Geotechnical Monitoring of "Lakhta Center" Tower

  • 30 Accesses

The paper contains the results of long-term monitoring during construction of the "Lakhta Center" tower in St. Petersburg. A brief description of the geotechnical monitoring system is provided, including types, quantity and location of the measurement equipment, methods of placement within structural components, and reading techniques. The comparison between the monitoring data and calculation results obtained by various methods demonstrated their qualitative and quantitative differences. A hypothesis regarding the effect of a number of factors on pile performance within the pile field is proposed. The recommendations on performing geotechnical calculations when constructing high-rise buildings are provided.

This is a preview of subscription content, log in to check access.

We’re sorry, something doesn't seem to be working properly.

Please try refreshing the page. If that doesn't work, please contact support so we can address the problem.

References

  1. 1.

    V. I. Travush, A. M. Shakhramanyan, Yu. A. Kolotovichev, et al., "Lakhta Center: automated monitoring of deformations of the bearing structures and the base," Academia. Arkhitektura i Stroitelstvo, No.4, 94-108 (2018).

  2. 2.

    O. A. Shulyatyev, Bases and Foundations of High-Rise Buildings, ACB, Moscow (2016).

  3. 3.

    H. G. Poulos, "Analysis of the settlement of pile groups," Geotechnique, 18(4), 449-471 (1968).

  4. 4.

    V. G. Fedorovskii, V. F. Aleksandrovich, S. V. Currillo, and A.G. Skorokhodov, "On calculation of combined plate-pile foundations," Novi Tekhgologii v budivnytstvi, 1(15), 59-72 (2008).

  5. 5.

    R. Katzenbach, S. Leppla, D. Choudhury, Foundation Systems for High-Rise Structures, CRC press (2017).

  6. 6.

    K. Terzaghi and R.B. Peck, Soil Mechanics in Engineering Practice, John Wiley and Sons, New York (1948).

Download references

Author information

Correspondence to S. O. Shulyat’ev.

Additional information

Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 2, pp. 15-21, March-April, 2019.

Rights and permissions

Reprints and Permissions

About this article

Verify currency and authenticity via CrossMark

Cite this article

Travush, V.I., Shulyat’ev, O.A., Shulyat’ev, S.O. et al. Analysis of the Results of Geotechnical Monitoring of "Lakhta Center" Tower. Soil Mech Found Eng 56, 98–106 (2019). https://doi.org/10.1007/s11204-019-09576-9

Download citation