Advertisement

Springer Nature is making Coronavirus research free. View research | View latest news | Sign up for updates

DBFOM Contracting and Public Stewardship in the Norfolk-Portsmouth Elizabeth River Tunnels Public-Private Partnership

  • 133 Accesses

Abstract

In 2011, the Virginia Department of Transportation issued a request for proposals to upgrade the Norfolk-Portsmouth Elizabeth River Midtown and Downtown Tunnels. The project involved government contracting with a local subsidiary of two foreign entities that would handle all project phases according to a Design-Build-Finance-Operate-Maintain (DBFOM) contract. The case of the Elizabeth River Tunnels (ERT) project is examined through the perspective of transaction cost theory and evaluates the DBFOM contracting method according to its impact on public stewardship. The research findings improve understanding of public-private partnerships (PPPs) by examining the connection between transaction costs and public stewardship.

This is a preview of subscription content, log in to check access.

References

  1. Elizabeth River Tunnels Comprehensive Agreement. (2011). Relating to the downtown tunnel/midtown tunnel/Martin Luther king freeway extension project. By and Among Virginia Department of Transportation and Elizabeth River Crossings. 5 December.

  2. Albalate, D., Bel, G., & Geddes, R. (2015). The determinants of contractual choice for private involvement in infrastructure projects. Public Money & Management, 35(1), 87–94.

  3. Alford, J., & O’Flynn, J. (2009). Making sense of public value: Concepts, critiques and emergent meanings. International Journal of Public Administration, 32(3/4), 171–191.

  4. Arnold, U. (2000). New dimensions of outsourcing: A combination of transaction cost economics and the core competencies concept. European Journal of Purchasing and Supply Management, 6(1), 23–29.

  5. Arrow, K. (1951). Social choice & individual values. New Haven: Yale University Press.

  6. Aubert, B. A., Patry, M., & Rivard, S. (2003). A tale of two outsourcing contracts: An agency-theoretical perspective. Wirtschaftsinformatik, 45(2), 181–190.

  7. Bahli, B., & Rivard, S. (2003). The information technology outsourcing risk: A transaction cost and agency-theory based perspective. Journal of Information Technology, 18(3), 211–221.

  8. Bauld, S. (2016). Shift needed in public procurement stewardship. Daily Commercial News, 89(99), 1–2.

  9. Block, P. (1993). Stewardship: Choosing service over self-interest. San Francisco: Berrett-Koehler.

  10. Brinkerhoff, D. W., & Brinkerhoff, J. M. (2011). Public-private partnerships: Perspectives on purposes, publicness, and good governance. Public Administration and Development, 31(1), 2–14.

  11. Brown, T., & Potoski, M. (2003). Managing contract performance: A transaction costs approach. Journal of Policy Analysis and Management, 22(2), 275–297.

  12. Brown, T., & Potoski, M. (2005). Transaction costs and contracting: The practitioner perspective. Public Performance and Management Review, 28(3), 326–351.

  13. Buchanan, J., & Tullock, G. (1962). The selected works of Gordon Tullock, Volume 2: The calculus of consent, logical foundations of constitutional democracy. Indianapolis: Liberty Fund.

  14. Chen, B. (2008). Assessing interorganizational networks for public service delivery: A process-perceived effectiveness framework. Public Performance and Management Review, 31(1), 348–363.

  15. Coase, R. (1937). The nature of the firm. Economica, 4(16), 386–405.

  16. Cui, C., Liu, Y., Hope, A., & Wang, J. (2018). Review of studies on the public-private partnerhips (PPP) for infrastructure projects. International Journal of Project Management, 36(5), 773–794.

  17. Das, T. K., & Teng, B. S. (2000). A resource-based theory of strategic alliances. Journal of Management, 26(1), 31–61.

  18. Davis, J. H., Schoorman, F. D., & Donaldson, L. (1997). Toward a stewardship theory of management. Academy of Management Review, 22(1), 20–47.

  19. Dicke, L., & Ott, J. S. (2002). A test: Can stewardship theory serve as a second conceptual foundation for accountability methods in contracted human services? International Journal of Public Administration, 25(4), 463–487.

  20. Ebdon, C., & Franklin, A. (2006). Citizen participation in budgeting theory. Public Administration Review, 66(3), 437–447.

  21. Eisenhardt, K. M. (1989). Agency theory: An assessment and review. The Academy of Management Review, 14(1), 57–74.

  22. Federal Highway Administration. (2017). U.S. Department of Transportation. Center for Innovative Finance Support. Virginia Office of Public-Private Partnerships. http://www.fhwa.dot.gov/ipd/project_profiles/va_midtown_tunnel.aspx

  23. Fernandez, S. (2009). Understanding contracting performance: An empirical analysis. Administration and Society, 41(1), 67–100.

  24. Ferris, J. M. (1986). The decision to contract out: An empirical analysis. Urban Affairs Quarterly, 22(2), 289–311.

  25. Ferris, J. M., & Graddy, E. (1991). Production costs, transaction costs, and local government contractor choice. Economic Inquiry, 29(3), 541–554.

  26. Flinders, M. (2005). The politics of public-private partnerships. The British Journal of Politics and International Relations, 7(2), 215–239.

  27. Flyvbjerg, B., Bruzelius, N., & Rothengarter, W. (2003). Megaprojects and risk: An anatomy of ambition. Cambridge: Cambridge University Press.

  28. Forrer, J., Kee, J. E., Newcomer, K. E., & Boyer, E. (2010). Public-private partnerships and the public accountability question. Public Administration Review, 70(3), 475–484.

  29. Forrer, J., Kee, J. E., & Boyer, E. (2014). Governing cross-sector collaboration. San Francisco: Jossey-Bass.

  30. Forster, D. (2015). McAuliffe rips toll deal, announces relief for Portsmouth motorists. The Virginian-Pilot, 11 July 2015. https://pilotonline.com/news/local/transportation/mcauliffe-rips-toll-deal-announces-relief-for-portsmouth-motorists/article_130c62be-9959-5dd7-960e-7da629ff15a7.html.

  31. Forster, D., Walker, J., & Eberly, T. (2013). Virginia Supreme Court reverses ruling on tunnel tolls. The Virginian-Pilot, 1 November. https://pilotonline.com/news/local/transportation/va-supreme-court-reverses-ruling-on-tunnel-tolls/article_f23618bd-c417-5db1–8594-a8c230202d70.html.

  32. Fox, A. (2017a). Portsmouth man who owes over $21,000 in tolls goes to court. WAVY News, 28 March. http://wavy.com/2017/03/28/portsmouth-man-who-owes-over-21000-in-tolls-goes-to-court/.

  33. Fox, A. (2017b). Tale of two tolls: Comparing the South Norfolk Jordan bridge to ERC tunnels. WAVY News, 29 March. http://wavy.com/2017/03/29/10-on-your-side-compares-south-norfolk-jordan-bridge-tolls-to-erc-tunnels/.

  34. Fumas, V. S., & Whinston, A. (1979). Flexible contracting theory and case examples. European Journal of Operational Research, 3(5), 368–378.

  35. Garvin, M. (2010). Enabling development of the transportation public-private partnership market in the United States. Journal of Construction Engineering and Management, 136(4), 402–411.

  36. Genus, A. (1997). Unstructuring incompetence: Problems of contracting, rust and the development of the channel tunnel. Technology Analysis & Strategic Management, 9(4), 419–436.

  37. Girth, A., Hefetz, A., Johnston, J., & Warner, M. (2012). Outsourcing public service delivery: Management responses in noncompetitive markets. Public Administration Review, 72(6), 887–900.

  38. Grimsey, D., & Lewis, M. (2005). Are public private partnerships value for money? Evaluating alternative approaches and comparing academic and practitioner views. Accounting Forum, 29(4), 345–378.

  39. Gross, M. E. (2010). Aligning public-private partnership contracts with public objectives for transportation infrastructure. Dissertation: Virginia Polytechnic Institute and State University. https://theses.lib.vt.edu/theses/available/etd-08242010173605/unrestricted/Gross_ME_D_2010.pdf.

  40. Hampton Roads Transportation Planning Organization Board. (2012). Summary TTAC Minutes. Attachment 20-C2. Page 8. January 4, 2012.

  41. Harris, A., Giunipero, L., & Hult, G. T. M. (1998). Impact of organizational and contract flexibility on outsourcing contracts. Industrial Marketing Management, 27(5), 373–384.

  42. Hart, O. (2003). Incomplete contracts and public ownership: Remarks, and an application to public-private partnerships. The Economic Journal, 113(486), 69–76.

  43. Hart, O., & Moore, J. (1988). Incomplete contracting and renegotiation. Economica, 56(4), 755–785.

  44. Hart, O., Shleifer, A., & Vishny, R. (1997). The proper scope of government: Theory and an application to prisons. Quarterly Journal of Economics, 112(4), 1127–1161.

  45. Heide, J. B., & John, G. (1990). Alliances in industrial purchasing: The determinants of joint action in buyer-supplier relationships. Journal of Marketing Research, 27(1), 24–36.

  46. Hirsch, W. Z. (1995). Contracting out by urban governments: A review. Urban Affairs Review, 30(3), 458–472.

  47. Hodge, G., Greve, C., & Boardman, A. (2017). Public-private partnerships: The way they were and what they can become. Australian Journal of Public Administration, 76(3), 273–282.

  48. Hoppe, E., Kusterer, D., & Schmitz, P. (2013). Public-private partnerships versus traditional procurement: An experimental investigation. Journal of Economic Behavior and Organization, 89(May), 145–166.

  49. Johnston, J., & Romzek, B. S. (2005). Traditional contracts as partnerships: Effective accountability in social service contracts in the American state. In G. Hodge & C. Greve (Eds.), The challenge of public-private partnerships: Learning from international experience (pp. 117–143). Cheltenham: Edward Elgar.

  50. Kaplan, S., & Garrick, J. (1981). On the quantitative definition of risk. Risk Analysis, 1(1), 11–27.

  51. Kelman, S. (2002). Strategic contracting management. In J. D. Donahue & J. S. Nye Jr. (Eds.), Market-based governance: Supply side, demand side, upside, and downside (pp. 88–102). Washington, DC: Brookings Institution Press.

  52. Kettl, D. (1993). Sharing power: Public governance and private markets. Washington, DC: Brookings Institution Press.

  53. Kettl, D. (2002). Managing indirect government. In L. M. Salamon (Ed.), The tools of government: A guide to the new governance (pp. 490–510). Oxford: Oxford University Press.

  54. Kim, H. L. (2017). Former VDOT head and HRT CEO Phil Shucet to take over at tunnel toll operator. The Virginian-Pilot, 30 March 2017. https://pilotonline.com/news/local/transportation/former-vdot-head-and-hrt-ceo-phil-shucet-to-take/article_b7b69d 10-fe05-5c34-9a85-02b1a83f3617.html.

  55. Klein, B., Crawford, R., & Alchian, A. (1978). Vertical integration: Appropriable rents and the competitive contracting process. Journal of Law and Economics, 21(2), 279–326.

  56. Koch, J. (2014). The differential impact of tolls on the City of Portsmouth. January 6, 2014. Retrieved from http://www.jamesvkoch.com/uploads/PortsmouthReport_010914.pdf.

  57. Koppenjan, J. (2005). The formation of public-private partnerships: Lessons from nine transport infrastructure projects in the Netherlands. Public Administration, 83(1), 135–157.

  58. Koppenjan, J., & Enserink, B. (2009). Public-private partnerships in urban infrastructures: Reconciling private sector participation and sustainability. Public Administration Review, 69(2), 284–296.

  59. Kwak, Y., Chih, Y., & Ibbs, C. (2009). Towards a comprehensive understanding of public private partnerships for infrastructure development. California Management Review, 51(2), 51–78.

  60. Lambright, K. (2009). Agency theory and beyond: Contracted providers’ motivations to properly use service monitoring tools. Journal of Public Administration Research and Theory, 19(2), 207–227.

  61. Laris, M. (2015). Virginia is getting soaked on midtown tunnel deal. The Washington Post, 19 October. http://hamptonroads.com/2015/10/virginia-getting-soaked-midtown-tunnel-deal.

  62. Laris, M. (2016). Non-compete agreement in one Virginia tunnel project haunts another. The Washington Post, 24 December. https://www.washingtonpost.com/local/trafficandcommuting/non-compete-agreement-in-one-virginia-tunnel-project-haunts-another/2016/12/24/7fa8940e-c889-11e6-bf4b2c064d32a4bf_story.html?utm_term=.eabbb68b2f98.

  63. Lavery, K. (1999). Smart contracting for local government services: processes and experience. Westport: Praeger.

  64. Levin, J., & Tadelis, S. (2010). Contracting for government services: Theory and evidence from U.S. cities. The Journal of Industrial Economics, 58(3), 507–541.

  65. Ley, A. (2017). With tunnel toll bills as high as $18,000, women plead for relief in Portsmouth and Norfolk. The Virginian-Pilot, 18 March 2017.

  66. Li, H., Arditi, D., & Wang, Z. (2013). Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), 60–68.

  67. Lindahl, E. (1919). Just taxation – A positive solution. In R. Musgrave & A. Peacock (Eds.), Classics in the theory of public finance (pp. 168–176). London: MacMillan.

  68. March, J., & Shapira, Z. (1987). Managerial perspectives on risk and risk taking. Management Science, 33(11), 1404–1418.

  69. Martin, L. L. (2016). Making sense of public-private partnerships (P3s). Journal of Public Procurement, 16(2), 191–207.

  70. McCue, C., & Johnson, B. (2010). Strategic procurement planning in the public sector. Herndon: NIGP.

  71. McIvor, R. (2009). How the transaction cost and resource-based theories of the firm inform outsourcing evaluation. Journal of Operations Management, 27(1), 45–63.

  72. McQuaid, R. W. (2000). The theory of partnerships: Why have partnerships? In S. P. Osborne (Ed.), Managing public-private partnerships for public service: An international perspective (pp. 9–35). London: Routledge.

  73. McQuaid, R. W., & Sherrer, W. (2010). Changing reasons for public-private partnerships (PPPs). Public Money & Management, 30(1), 27–34.

  74. Mills, T., Normand, C., & Palmer, R. (2008). Governmental purchase card programs: A case on the stewardship of public resources. Accounting Perspectives, 7(1), 69–81.

  75. Milward, H. B., & Provan, K. G. (2006). A manager's guide to choosing and using collaborative networks (Vol. 8). Washington, DC: IBM Center for the Business of Government.

  76. Mouzas, S. (2016). Performance based contracting in long-term supply relationships. Industrial Marketing Management, 59, 50–62.

  77. Nanda, A. (2003). The Essence of professionalism: managing conflict of interest. Harvard Business Review, Working Paper 03–066.

  78. Office of Public-Private Partnerships. (2012). Governor McDonnell announces VDOT and ERC reach financial close on midtown tunnel project in Hampton roads region. 16 April. http://www.p3virginia.org/governor-mcdonnell-announces-vdot-and-erc-reach-financial-close-on-midtown-tunnel-project-in-hampton-roads-region/.

  79. Olson, M. (1965). The logic of collective action: Public goods and the theory of groups. Cambridge: Harvard University Press.

  80. Opara, M., Elloumi, F., Okafor, O., & Warsame, H. (2017). Effects of the institutional environment on public-private partnership (P3) projects: Evidence from Canada. Accounting Forum, 41(2), 77–95.

  81. Ortiz, I. N., & Buxbaum, J. N. (2008). Protecting the public interest in long-term concession agreements for transportation infrastructure. Public Works Management & Policy, 13(2), 126–137.

  82. Parker, D., & Hartley, K. (2003). Transaction costs, relational contracting and public private partnerships: A case study of UK defence. Journal of Purchasing and Supply Management, 9(3), 97–108.

  83. Pascale, J. (2016). Midtown, Downtown Tunnel Tolls Set for Their Largest Rate Increase Next Year. The Virginian-Pilot, 15 November. https://pilotonline.com/news/local/transportation/midtown-downtown-tunnel-tolls-set-for-their-largest-rate-increase/article_d7c0991c-d4f1-5f20-b219-8d9c4cc58a98.html.

  84. Peteraf, M. A. (1993). The cornerstones of competitive advantage: A resource-based view. Strategic Management Journal, 14(3), 179–191.

  85. Pitzer, J., & Thai, K. (2009). Introduction to public procurement (3rd ed.). Herndon: National Institute of Governmental Purchasing.

  86. Poschmann, F. (2003). Private means to public ends: The future of public-private partnerships. Toronto: Howe Institute.

  87. Randall, W. S., Nowicki, D., & Hawkins, T. G. (2011). Explaining the effectiveness of performance based logistics: A quantitative investigation. International Journal of Logistics Management, 22(3), 324–338.

  88. Reeves, E., & Ryan, J. (2007). Piloting public-private partnerships: Expensive lessons from Ireland’s schools’ sector. Public Money & Management, 27(5), 331–338.

  89. Ross, W., and Navarro, P. (2016). Trump versus Clinton on infrastructure. October 27, 2016. http://peternavarro.com/sitebuildercontent/sitebuilderfiles/infrastructurereport.pdf.

  90. Runde, J., Offutt, J. P., Selinger, S. D., & Bolton, J. S. (2010). Infrastructure public-private partnerships re-defined: An increased emphasis on “partnerships”. Journal of Applied Corporate Finance, 22(2), 69–73.

  91. Sagalyn, L. (2007). Public/private development: Lessons from history, research, and practice. Journal of the American Planning Association, 73(1), 7–22.

  92. Samuelson, P. (1954). The pure theory of public expenditure. The Review of Economics and Statistics, 36(4), 387–389.

  93. Satchell, E. (2017). Portsmouth man’s toll trouble resolved; ERC changing how it does business. WAVY News, 7 April. https://www.wavy.com/news/portsmouth-manstoll-trouble-resolved-erc-changing-how-it-doesbusiness_20180320061047643/1060950022.

  94. Scharle, P. (2002). Public-private partnerships (ppp) as a social game. Innovation: The European Journal of Social Science Research, 15(3), 227–252.

  95. Schickler, E. (2001). Disjointed pluralism: Institutional innovation and the development of the U.S. congress. Princeton: Princeton University Press.

  96. Shaoul, J., Stafford, A., & Stapleton, P. (2007). Private control over public policy: Financial advisors and the private finance initiative. Policy and Politics, 35(3), 479–496.

  97. Shi, L., He, Y., Onishi, M., & Kobayashi, K. (2018). Efficiency analysis of government subsidy and performance guarantee policies in relation to PPP infrastructure projects. Mathematical Problems in Engineering, 18, 1–11.

  98. Siemiatycki, M. (2010). Delivering transportation infrastructure through public-private partnerships: Planning concerns. Journal of the American Planning Association, 76(1), 43–58.

  99. Snippert, Y., Witteveen, W., Boes, J., & Voordijk, J. (2015). Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), 569–586.

  100. Soecipto, R. M., & Verhoest, K. (2018). Contract stability in European road infrastructure PPPs: How does governmental PPP support contribute to preventing contract renegotiation? Public Management Review, 20(8), 1145–1164.

  101. Soliño, A. S., & Gago De Santos, P. (2010). Transaction costs in transport public-private partnerships: Comparing procurement procedures. Transport Reviews, 30(3), 389–406.

  102. Spicer, M. (2010). In defense of politics in public administration: A value pluralist perspective. Tuscaloosa: University of Alabama Press.

  103. Turner, R. J., & Simister, S. (2001). Project contract management and a theory of organization. International Journal of Project Management, 19(8), 457–464.

  104. U.S. Department of Transportation (2014). Downtown Tunnel/Midtown Tunnel/MLK Extension, Norfolk and Portsmouth, VA. Build America Bureau. http://www.transportation.gov/policy-initiatives/build-america/downtown-tunnelmidtown-tunnelmlk-extension-norfolk-and-portsmouth

  105. U.S. Federal Budget. (2018). Budget of the U.S. Federal Government. Office of Management and Budget. https://www.whitehouse.gov/wp-content/uploads/2018 /02/budget-fy2019.pdf.

  106. Verweij, S. (2015). Achieving satisfaction when implementing PPP transportation infrastructure projects: A qualitative comparative analysis of the A15 highway DBFM project. International Journal of Project Management, 33(1), 189–200.

  107. Waldo, D. (1982). The enterprise of public administration. Novato: Chandler and Sharp.

  108. Wang, X. (2001). Assessing public participation in U.S. cities. Public Performance and Management Review, 24(4), 322–336.

  109. Weidenbaum, M. (1981). Benefit-cost analysis of government regulation. St. Louis: Center for the Study of American business, Washington University.

  110. Weimer, D. L., & Vining, A. R. (1999). Policy analysis: Concepts and practice (3rd ed.). Upper Saddle River: Prentice Hall.

  111. Wettenhall, R. (2005). The public-private interface: Surveying the history. In G. Hodge & C. Greve (Eds.), The challenge of public-private partnerships: Learning from international experience (pp. 22–43). Cheltenham: Edward Elgar.

  112. Whittington, J. (2012). When to partner for public infrastructure?: Transaction cost evaluation of design-build delivery. Journal of the American Planning Association, 78(3), 269–285.

  113. Wilkins, J. (2014). Stewardship of public service renewal and reform. The International Journal of Leadership in Public Services, 10(4), 188–199.

  114. Williamson, O. (1975). Markets and hierarchies: Analysis and antitrust implications. New York: Free Press.

  115. Williamson, O. (1981). The economics of organization. American Journal of Sociology, 87(3), 548–577.

  116. Williamson, O. (1985a). The economic institutions of capitalism. New York: The Free Press.

  117. Williamson, O. (1985b). Assessing contract. Journal of Law, Economics, and Organization, 1(1), 177–208.

  118. Williamson, O. (1997). Transaction cost economics and public administration. In P. Boorsma, K. Aarts, & A. Steenge (Eds.), Public priority setting: Rules and costs (pp. 19–37). London: Kluwer Academic.

  119. Williamson, O. (2002). The theory of the firm as governance structure: From choice to contract. The Journal of Economic Perspectives, 16(3), 171–195.

  120. Williamson, O. (2010). Transaction cost economics: The origins. Journal of Retailing, 86(3), 227–231.

  121. Winch, G. M. (1989). The construction firm and the construction project: A transaction cost approach. Construction Management and Economics, 7(4), 331–345.

  122. Yescombe, E. R. (2007). Public-private partnerships: Principles of policy and Finance. Burlington: Butterworth Heinemann.

Download references

Author information

Correspondence to Joshua Steinfeld.

Rights and permissions

Reprints and Permissions

About this article

Verify currency and authenticity via CrossMark

Cite this article

Steinfeld, J., Carlee, R. & Koala, K. DBFOM Contracting and Public Stewardship in the Norfolk-Portsmouth Elizabeth River Tunnels Public-Private Partnership. Public Organiz Rev 20, 37–62 (2020). https://doi.org/10.1007/s11115-018-0426-6

Download citation

Keywords

  • Design-build-finance-operate-maintain contracting
  • Public stewardship
  • Transaction costs
  • Asset specificity
  • Public-private partnerships
  • Government contracting
  • Procurement