Reconstruction management policies in residential and commercial sectors after the 2003 bam earthquake in Iran

Original Paper

Abstract

In the very early hours of 26th December 2003, a devastating and strong earthquake with a magnitude of 6.5 struck Bam, one of the historical cities of Kerman province in the south of Iran. According to the official reports, more than 30,000 were killed and about 25,000 injured. More than 80% of the town’s buildings were also destroyed. After the disaster, Bam’s reconstruction management process was presented with a lot of challenges and faced many fundamental questions. The number of human losses and related social issues, extensive destruction of the historical town, and also the lack of good experience in the reconstruction of a city or town made the reconstruction project of Bam more complicated. The reconstruction of Bam was the most important post-disaster reconstruction project among recent reconstructions in Iran. Many factors, such as concern over the government and international agencies, the new managerial approaches, and the application of appropriate reconstruction methods, made it different from the other reconstruction programs. Thus, the post-earthquake reconstruction of Bam is investigated in this research with respect to the importance of this issue. The aim behind this article is to give a brief explanation of the earthquake reconstruction management policies in Bam and also the plans for the reconstruction and rebuilding of urban residential and commercial units.

Keywords

Bam earthquake Reconstruction management Residential and commercial units Policymaking Community participation 

References

  1. Abbasi A (2008) The study of the effect of reconstruction manager’s performance on the affected community satisfaction after the Bam Earthquake (Case study: Providing settlement for Baravat). A Thesis submitted for the degree of Master of Science in Natural Disaster Management, Faculty of Environment, University of Tehran, Tehran, Iran (in Persian)Google Scholar
  2. Ahmadzadeh S (2004) The revival of the Bam society in the reconstruction process, Research report No. 1, Natural Disaster Research Institute of Iran (NDRII), Tehran, Iran (in Persian)Google Scholar
  3. Ahmadzadeh S (2007) The socio-economic study of Bam in the reconstruction process, Research report, Natural Disaster Research Institute of Iran (NDRII), Tehran, Iran (in Persian)Google Scholar
  4. Alexander D (2006) “From rubble to monument” revised: modernised perspectives on recovery from disaster, Post-disaster reconstruction: meeting stakeholders interests. In: Proceedings of a conference held at the Scuola di Sanità Militare, Firenze university press, Florence, ItalyGoogle Scholar
  5. Aysan Y, Davis I (1993) Rehabilitation and reconstruction. Disaster management training programme. UNDP, GenevaGoogle Scholar
  6. Bahreini SH, Akhoundi A (2000) Reconstruction management of the disaster affected areas: the experience of reconstruction of housing in the earthquake affected areas of the Gilan and Zanjan Provinces, Iran 1990–1992, University of Tehran press (in Persian)Google Scholar
  7. Binesh N (2008) The process of shelter provision (Emergency shelter to permanent one) after Lorestan 2006 earthquake). A Thesis submitted for the degree of Master of Science in Natural Disaster Management, Faculty of Environment, University of Tehran, Tehran, Iran (in Persian)Google Scholar
  8. Eshghi S, Ahari MN (2005) Performance of transportation systems in the 2003 Bam, Iran, Earthquake. Earthq Spectra 21(S1):S455–S468CrossRefGoogle Scholar
  9. Ghafory-Ashtiany M, Hosseini M (2008) Post-Bam earthquake: recovery and reconstruction. Nat Hazards 44:229–241CrossRefGoogle Scholar
  10. HFIR (Housing Foundation of Islamic Revolution) (2003) The reconstruction plan of the affected residential areas of the Bam Township after the 2003 earthquake (in Persian)Google Scholar
  11. HFIR (Housing Foundation of Islamic Revolution) (2004) Bam earthquake and reconstruction plan of the devastated areasGoogle Scholar
  12. HFIR (Housing Foundation of Islamic Revolution) (2009) The collection of work progress reports, 2004–2009 (in Persian)Google Scholar
  13. Kates RW, Pijawka D (1977) From rubble to monument: the pace of reconstruction. In: Haas JE, Kates RW, Bowden MJ (eds) Disaster and reconstruction. MIT Press, Cambridge, pp 1–23Google Scholar
  14. National Report of the Islamic Republic of Iran on Disaster Reduction (2005) World Conference on Disaster Reduction, Kobe, Hyogo, JapanGoogle Scholar
  15. NCCI (National Cartographic of Iran) (2004) Map of damage level of Bam buildingsGoogle Scholar
  16. OCHA (Office for the Coordination of Humanitarian Affairs) (2004) Iran—earthquake occurred on 26 December 2003, Situation Report No. 11Google Scholar
  17. Omidvar B, Zafari H (2007) Community based reconstruction, risk reduction and sustainable development. In: 2nd International conference on integrated natural disaster management, Tehran, Iran (in Persian)Google Scholar
  18. Omidvar B, Ghasemi R., Zafari H (2008) Localized solutions in temporary housing after the Lorestan 2006 earthquake, Iran. Soffeh Journal, No. 44, The School of Architecture and Urban Planning, Shahid Beheshti University, Tehran, Iran (in Persian)Google Scholar
  19. SCI (Statistics Centre of Iran) (2004) The results of the places and families listing of Bam earthquake regions (in Persian)Google Scholar
  20. Tierney KJ (1993) Disaster preparedness and guidance from the social science literature, US-RCO Workshop on Natural Disaster Reduction, Taipei, Taiwan, ROCGoogle Scholar
  21. UNDP (United Nations Development Program) (2004) A global report reducing disaster risk: a challenge for developmentGoogle Scholar
  22. UNDRO (the United Nations Disaster Relief Office (1982) Shelter after disaster: guidelines for assistance. United Nations, New YorkGoogle Scholar
  23. Zafari H (2008) Study of physical reconstruction management with focus on community participation (Case study: Bam earthquake). A Thesis submitted for the degree of Master of Science in Natural Disaster Management, Faculty of Environment, University of Tehran, Tehran, Iran (in Persian)Google Scholar
  24. Zafari H, Fatemi Aghda SM, Rasoolan I (2008a) For Comparison of village housing construction patterns of earthquake affected regions in the Lorestan Province—before and after an earthquake. In: The 14th World Conference on Earthquake Engineering, Beijing, ChinaGoogle Scholar
  25. Zafari H, Jodi M, Alizamani M (2008b) The comparative study of reconstruction management of Gilan and Zanjan 1990 earthquake and Bam 2003 Earthquake. In: 3rd international conference on integrated natural disaster management Tehran, Iran (in Persian)Google Scholar

Copyright information

© Springer Science+Business Media B.V. 2009

Authors and Affiliations

  1. 1.Graduate Faculty of EnvironmentUniversity of TehranTehranIran
  2. 2.Reconstruction Engineer of Housing Foundation of IranTehranIran

Personalised recommendations