A note on the complexity of the concurrent open shop problem

  • Thomas A. RoemerEmail author
Article

Abstract

The concurrent open shop problem is a relaxation of the well known open job shop problem, where the components of a job can be processed in parallel by dedicated, component specific machines. Recently, the problem has attracted the attention of a number of researchers. In particular, Leung et al. (2005) show, contrary to the assertion in Wagneur and Sriskandarajah (1993), that the problem of minimizing the average job completion time is not necessarily strongly NP-hard. Their finding has thus once again opened up the question of the problem's complexity. This paper re-establishes that, even for two machines, the problem is NP-hard in the strong sense.

Keywords

Order scheduling Total completion time Complexity Internal and external performance measures 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Ahmadi, R. H. and U. Bagchi, “Scheduling of Multi-Job Customer Orders in Multi-Machine Environments,” ORSA/TIMS, Philadelphia, 1990.Google Scholar
  2. Ahmadi, R. H. and U. Bagchi, “Coordinated Scheduling of Customer Orders,” Working Paper, Anderson School at UCLA (1993).Google Scholar
  3. Ahmadi, R. H. and U. Bagchi, “Coordinated Scheduling of Customer Orders,” updated Working Paper, Anderson School at UCLA (1997).Google Scholar
  4. Ahmadi, R. H., U. Bagchi, and T.A. Roemer, “Coordinated Scheduling of Customer Orders for Quick Response,” forthcoming in Naval Research Logistics (2006).Google Scholar
  5. Baker, K. R., Introduction to sequencing and scheduling, Wiley, New York 1974.Google Scholar
  6. Chen Z. L. and N. G. Hall, “Supply chain scheduling: Assembly systems,” Working Paper, Department of Systems Engineering, University of Pennsylvania 2000.Google Scholar
  7. Graham, R. L., E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnooy Kan, “Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey,” Annals of Discrete Mathematics, 5, 287–326 1979.CrossRefGoogle Scholar
  8. Lee, C.-Y., T. C. E. Cheng, and B. M. T. Lin, “Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem,” Management Science, 39(5), 616–625 1993.Google Scholar
  9. Leung, J.Y.-T, H. Li, and M. Pinedo, “Order Scheduling in an Environment with Dedicated Resources in Parallel,” Journal of Scheduling, 8, 355–386 2005a.CrossRefGoogle Scholar
  10. Leung, J.Y.-T, H. Li, and M. Pinedo, “Scheduling Orders for Multiple Product Types to Minimize Total Weighted Completion Time,” Working Paper 2005b.Google Scholar
  11. Leung, J.Y.-T, H. Li, and M. Pinedo, “Order Scheduling Models: An Overview,” In Multidisciplinary scheduling: Theory and applications , G. Kendall, E. K. Burke, S. Petrovic and M. Gendreau (eds.), Springer, New York, 2005c.Google Scholar
  12. Leung, J.Y.-T, H. Li, M. Pinedo and C. Sriskandarajah, “Open shops with jobs overlap—revisited,” European Journal of Operational Research, 163, 569–571 2005.Google Scholar
  13. Morton, T. E. and D. W. Pentico, Heuristic Scheduling System, Wiley, New York (1993).Google Scholar
  14. Ng, C.T., T. C. E. Cheng, and J. J. Yuan, “Concurrent Open Shop Scheduling to Minimize the Weighted Number of Tardy Jobs,” Journal of Scheduling, 6, 405–412 (2003).CrossRefGoogle Scholar
  15. Pinedo, M., Scheduling: Theory, algorithms and systems, Prentice Hall, Englewood Cliffs, NJ (2002).Google Scholar
  16. Potts, C. N., S. V. Sevast Janov, V. A. Strusevich, L. N. Van Wassenhove and C. M. Zwaneveld, “The Two-Stage Assembly Scheduling Problem: Complexity and approximations,” Operations Research, 43(2), 346–355 1995.CrossRefGoogle Scholar
  17. Roemer, T. A. and R. Ahmadi, “The Complexity of Scheduling Customer Orders,” Working Paper, Anderson School at UCLA (1997a).Google Scholar
  18. Roemer, T. A. and R. Ahmadi, “The Complexity of Scheduling Customer Orders,” INFORMS, Dallas (1997b).Google Scholar
  19. Sung, C. S. and S. H. Yoon, “Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines,” International Journal of Production Economics, 54, 247–255 (1998).CrossRefGoogle Scholar
  20. Wagneur, E. and C. Sriskandarajah, “Open shops with jobs overlap,” European Journal of Operational Research, 71, 366–378 (1993).CrossRefGoogle Scholar
  21. Wang, G. and T. C. E. Cheng, “Customer Order Scheduling To Minimize Total Weighted Completion Time,” In Proceedings of the first Multidisciplinary Conference on Scheduling Theory and Applications, 2003, pp. 409–416.Google Scholar
  22. Yang, J., “The complexity of customer order scheduling problems on parallel machines,” Computers & Operations Research, 32, 1921–1939 2005.CrossRefGoogle Scholar
  23. Yang, J. and M. E. Posner, “Scheduling Parallel Machines For The Customer Order Problem,” Journal of Scheduling, 8, 49–74 (2005).CrossRefGoogle Scholar

Copyright information

© Springer Science + Business Media, LLC 2006

Authors and Affiliations

  1. 1.Leaders for Manufacturing Program & Sloan School of ManagementMassachusetts Institute of TechnologyCambridge

Personalised recommendations