Advertisement

Journal of Global Optimization

, Volume 73, Issue 3, pp 675–676 | Cite as

Book Review: Xinbao Liu, Jun Pei, Lin Liu, Hao Cheng, Mi Zhou, and Panos M. Pardalos: Optimization and management in manufacturing engineering. Resource collaborative optimization and management through the Internet of Things. Springer optimization and its applications series

Springer, 2017, XVIII pp, Hardcover: ISBN: 978-3-319-64567-4
  • John R. BirgeEmail author
Article
  • 186 Downloads

References

  1. 1.
    Pei, Jun, Liu, Xinbao, Fan, Wenjuan, Pardalos, Panos M., Shaojun, Lu: A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers. Omega (2017).  https://doi.org/10.1016/j.omega.2017.12.003 Google Scholar
  2. 2.
    Pei, Jun, Pardalos, Panos M., Liu, Xinbao, Fan, Wenjuan, Yang, Shanlin: Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan. Eur. J. Oper. Res. 244(1), 13–25 (2015)MathSciNetCrossRefzbMATHGoogle Scholar
  3. 3.
    Pei, Jun, Liu, Xinbao, Pardalos, Panos M., Fan, Wenjuan, Wang, Ling, Yang, Shanlin: Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm. Int. J. Syst. Sci. 47(4), 765–776 (2016)MathSciNetCrossRefzbMATHGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC, part of Springer Nature 2018

Authors and Affiliations

  1. 1.University of ChicagoChicagoUSA

Personalised recommendations