Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint

  • Mohamed-Aly Louly
  • Alexandre DolguiEmail author
  • Abdulrahman Al-Ahmari
Article

Abstract

This study deals with component supply planning in assembly systems, i.e. where several types of components are needed to produce one finished product. The actual component lead times have random deviations, so they can be considered as random variables. MRP approach with Periodic Order Quantity policy is considered. The aim is to find the optimal MRP offsetting. The proposed model and algorithms minimize the sum of the setup and average holding costs for the components, while satisfying a desired service level.

Keywords

Assembly systems Supply planning Stochastic lead times Periodic order quantity MRP parameterization 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Arda Y., Hennet J. C. (2006) Inventory control in a multi-supplier system. International Journal of Production Economics 104(2): 249–259CrossRefGoogle Scholar
  2. Axsäter S. (2005) Planning order release for an assembly system with random operations times. OR Spectrum 27: 459–470CrossRefGoogle Scholar
  3. Axsäter S. (2006) Inventory control, 2nd edition. Springer, BerlinGoogle Scholar
  4. Baker K. R. et al (1993) Requirement planning. In: Graves S. C. (eds) Handbooks in operations research and management science, logistics of production and inventory, vol. 4. North-Holland, Amsterdam, pp 571–628CrossRefGoogle Scholar
  5. de Kok T. G., Visschers J. W. C. H. (1999) Analysis of assembly systems with service level constraints. International Journal of Production Economics 59: 313–326CrossRefGoogle Scholar
  6. Dolgui A. (2001) On a model of joint control of reserves in automatic control systems of production. Automation and Remote Control 62(12): 2020–2026CrossRefGoogle Scholar
  7. Dolgui A., Portmann M. C., Proth J. M. (1995) Planification de systèmes d’assemblage avec approvisionnement aléatoire en composants. Journal of Decision Systems 4(4): 255–279CrossRefGoogle Scholar
  8. Dolgui A., Louly M. A. (2002) A model for supply planning under lead time uncertainty. International Journal of Production Economics 78: 145–152CrossRefGoogle Scholar
  9. Dolgui A., Prodhon C. (2007) Supply planning under uncertainties in MRP environments: A state of the art. Annual Reviews in Control 31(2): 269–279CrossRefGoogle Scholar
  10. Elhafsi M. (2002) Optimal leadtimes planning in serial production systems with earliness and tardiness costs. IIE Transactions 34: 233–243Google Scholar
  11. Fujiwara O., Sedarage D. (1997) An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times. European Journal of Operational Research 100: 550–556CrossRefGoogle Scholar
  12. Kaplan R. S. (1970) A dynamic inventory model with stochastic lead times. Management Science 16: 491–507CrossRefGoogle Scholar
  13. Khang D. B., Fujiwara O. (1993) Multi-period stochastic network flow problems with service level requirements: approximation and error estimates. IIE Transactions 25(2): 104–110CrossRefGoogle Scholar
  14. Koh S. C. L., Saad S. M. (2003) MRP-controlled manufacturing environment disturbed by uncertainty. Robotics and Computer Integrated Manufacturing 19: 157–171CrossRefGoogle Scholar
  15. Kumar A. (1989) Component inventory cost in an assembly problem with uncertain supplier lead-times. IIE Transactions 21(2): 112–121CrossRefGoogle Scholar
  16. Lee H. L., Nahmias S. et al (1993) Single-product, single-location models. In: Graves S. C. (eds) Handbooks in operations research and management science, logistics of production and inventory, vol. 4. North-Holland, Amsterdam, pp 3–57CrossRefGoogle Scholar
  17. Liberatore M. J. (1979) The EOQ model under stochastic lead times. Operations Research 27: 391–396CrossRefGoogle Scholar
  18. Louly M. A., Dolgui A. (2002) Newsboy model for supply planning of assembly systems. International Journal of Production Research 40: 4401–4414CrossRefGoogle Scholar
  19. Louly M. A., Dolgui A. (2004) The MPS parameterization under lead time uncertainty. International Journal of Production Economics 90: 369–376CrossRefGoogle Scholar
  20. Louly M. A., Dolgui A., Hnaien F. (2008a) Supply planning for single-level assembly system with stochastic component delivery times and service level constraint. International Journal of Production Economics 115(1): 236–247CrossRefGoogle Scholar
  21. Louly M. A., Dolgui A., Hnaien F. (2008b) Optimal supply planning in MRP environments for assembly systems with random component procurement times. International Journal of Production Research 46(19): 5441–5467CrossRefGoogle Scholar
  22. Louly, M.A., & Dolgui, A. (2008). An optimization approach for time phasing in MRP systems. In: Preprints of the fifteen international working seminar on production economics, Innsbruck, Austria, March 3–7, vol. 3, pp. 273–280.Google Scholar
  23. Molinder A. (1997) Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system. International Journal of Production Research 35: 983–994CrossRefGoogle Scholar
  24. Mula J., Poler R., Garcıa-Sabater J. P., Lario F. C. (2006) Models for production planning under uncertainty: A review. International Journal of Production Economics 103: 271–285CrossRefGoogle Scholar
  25. Petruzzi N. C., Dada M. (1999) Pricing and the newsvendor problem: A review with extensions. Operations Research 47: 183–194CrossRefGoogle Scholar
  26. Porteus E. L. (1990) Stochastic inventory theory. In: Heyman D. P., Sobel M. J. (eds) Hand-book in OR and MS, vol. 2. Elsevier Science Publishers, Amsterdam, pp 605–652Google Scholar
  27. Proth J. M., Mauroy G., Wardi Y., Chu C., Xie X. (1997) Supply management for cost minimization in assembly systems with random component yield times. Journal of Intelligent Manufacturing 8(5): 385–403CrossRefGoogle Scholar
  28. Rao S., Schneller G. O. (1990) On the stochastic non-sequential production-planning problem. Journal of the Operational Research Society 41: 241–247Google Scholar
  29. Rosling K. (1989) Optimal inventory policies for assembly systems under random demands. Operations Research 37: 365–579CrossRefGoogle Scholar
  30. Sipper D., Bulfin R. L. Jr. (1998) Production: Planning, control and integration. McGraw Hill, New YorkGoogle Scholar
  31. Sridharan V., Berry W. L. (1990) Master production schedule, make-to-stock products: A framework for analysis. International Journal of Production Research 28: 541–558CrossRefGoogle Scholar
  32. Sox C. R., Muckstadt J. A. (1996) Multi-item, multi-period production planning with uncertain demand. IIE Transactions 28: 891–900Google Scholar
  33. Tang O., Grubbstrom R. W. (2003) The detailed coordination problem in a two-level assembly system with stochastic lead times. International Journal of Production Economics 81–82: 415–429CrossRefGoogle Scholar
  34. Tempelmeier H. (2006) Inventory management in supply networks: Problems, models, solutions. Books on demand GmbH, GermanyGoogle Scholar
  35. Whybark D. C., Wiliams J. G. (1976) Material requirement under uncertainty. Decision Science 7: 595–606CrossRefGoogle Scholar
  36. Yano C. A. (1987a) Setting planned leadtimes in serial production systems with tardiness costs. Management Science 33(1): 95–106CrossRefGoogle Scholar
  37. Yano C. A. (1987b) Stochastic leadtimes in two-level assembly systems. IIE Transactions 19(4): 95–106CrossRefGoogle Scholar
  38. Yeung J. H. Y., Wong W. C. K., Ma L. (1998) Parameters affecting the effectiveness of MRP systems: A review. International Journal of Production Research 36: 313–331CrossRefGoogle Scholar
  39. Yeung J. H. Y., Wong W. C. K., Ma L., Law J. S. (1999) MPS with multiple freeze fences in multi-product multi-level MRP systems. International Journal of Production Research 37: 2977–2996CrossRefGoogle Scholar
  40. Zipkin P. (2000) Foundation of inventory management. McGraw-Hill, New YorkGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC 2011

Authors and Affiliations

  • Mohamed-Aly Louly
    • 1
  • Alexandre Dolgui
    • 2
    Email author
  • Abdulrahman Al-Ahmari
    • 1
  1. 1.FARCAMT, Industrial Engineering Department, College of EngineeringKing Saud UniversityRiyadhKingdom of Saudi Arabia
  2. 2.Centre for Industrial Engineering and Computer ScienceEcole des Mines de Saint-EtienneSaint-Etienne Cedex 2France

Personalised recommendations