Operation of the dam of the Bureiskaya HPP during filling of the reservoir

  • V. N. Durcheva
  • S. M. Puchkova
Hydrotechnical Construction

Abstract

Operation of the dam in a transitional mode is described.

Keywords

Seepage Flow Grout Curtain Downstream Face Pressure Face Channel Part 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    V. N. Durcheva, É. K. Aleksandrovskaya, and E. A. Ivleva, “Control of the condition of the erected dam of the Bureiskaya HPP,” Gidrotekh. Stroit., No. 2 (2003).Google Scholar

Copyright information

© Springer Science+Business Media, Inc. 2006

Authors and Affiliations

  • V. N. Durcheva
    • 1
  • S. M. Puchkova
    • 1
  1. 1.Vedeneev All-Russia Research Institute for HydroengineeringSt. PetersburgRussia

Personalised recommendations